Laserfiche WebLink
it (q <br /> N <br /> HAMMER LANE <br /> 15 30 <br /> PLANTER SCALE IN FEST <br /> PLANTER <br /> I <br /> 1 <br /> I <br /> MW-3 <br /> (-14.24) PUMP ISLANDS rn <br /> rC <br /> I � <br /> I C <br /> MW-2 rn <br /> 1 � <br /> (-14.34) <br /> m <br /> SERVICE STATION > u,0 1 y� 70 <br /> BUILDING <br /> MW-1 <br /> 14.34)\ -14.34 <br /> UNDERGROUND <br /> FUEL TANKS <br /> MW-4 �� <br /> (-1 4.1 8) - ��UNDERGROUND <br /> USED OIL TANK <br /> LEGEND FIGURE 2 <br /> 0 GROUNDWATER MONITORING WELL POTENTIOMETRIC GROUNDWATER <br /> (-14.34) FEET ABOVTE MELEVATION <br /> AN sTION LEVEL <br /> ELEVATION CONTOUR MAP <br /> o- -14.30— GROUNDWATER ELEVATION OCTOBER 5, 1993 <br /> CONTOUR IN FEET ABOVE BP OIL SERVICE STAT10N NO. 11193 <br /> (CONTOUR LEVEL <br /> TE ERVAL-0.05 FOOT) 3202 WEST HAMMER LANE R <br /> CALCULATED GROUNDWATER STOCKTON, CALIFORNIA <br /> GRADIENT DIRECTION AND PROJECT NO. 10-136 <br /> MAGNITUDE IN FOOT PER FOOT <br /> �ALWO ENGINEERING GROUP <br /> /�\ WALNUT CREEK, CALIFORNIA $ <br />