Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> Project #: fqo( l9 -TZ- Client: f3 P <br /> Sampler: (g StartDate: f !f q/4h <br /> Weil I.D.: /-7 Well Diameter("7 3 4 6 8 <br /> Total Well Depth: 19, 'ZG IDepth to Water: 1 Z•Z 7 <br /> Before: After: lBefore: After: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: vc Grade D.O. Meter (if req'd): YSl xacH <br /> Purge Method: Bailer Samalins Method: Bailer <br /> Disposable Bailer Disaosabie Baine: <br /> Middleburg Extraction Pon <br /> Electric Submersible Other: <br /> Extraction Pump <br /> Other: We l Di=ecer Muitiniier Weil Diameter Multioiier <br /> 2" 0.16 1.02 <br /> 2-7 <br /> (Gais.) X 3 _ Gals. 13 <br /> 1 Case Volume Soecified Volumes Calculated Voiume ;. 0.65 Ocher radius" o.t63 <br /> Time Temp (°F)I pH I Cond. Turbidity Gals- Removed Observations <br /> 7, ( �33� I -7 3 o <br /> 7,0 <br /> I <br /> I I I I I <br /> Did well dewater? Yes No Gallons actually evacuated: <br /> Sampling Time: ) Ta Sampling Date: <br /> Sample T.D.: C Laboratory: SPL I <br /> Analyzed for: TPH-D Other: <br /> � IEquipment Blank I.D.: iimc Duplicate I.D.: <br /> 0,A-naJy7-ed for: TPH-G BTEX MTBE TPH-D Other: <br /> D.O. (if req'd): Pre-purge: L Post-purge: ��/L <br /> ORP (if req'd): Pre-purge: mV Post-purge: mV <br />