Laserfiche WebLink
1 <br /> ARCO AM/PM <br /> 1 SERVICE STATION <br /> 1 , <br /> .. PRIVATE ROAD SCALE (FT.) <br /> Q 30 <br /> s <br /> O <br /> C O <br /> 'b' Cb' AI <br /> MW-4 SERVICETATION MW-3 <br /> —8.33 BUILDING —7.62 z Ld z <br /> a <br /> I 1 � � <br /> L J DISPENSER <br /> ISLANDS MW-7 <br /> UNDERGROUND -7.81 <br /> USED OIL TANK <br /> Q EXP€_ANATION <br /> MONITORING WELL <br /> cn ---7.81 GROUNDWATER ELEVATION (FT, MSL} <br /> *? �,MW .69 MW-5 J7 7CJ � GROLLJ UNDWATER ELEVATION CONTOUR (FT, MSI_) <br /> 7.73 NA DATAI, NOT AVAILABLE <br /> f > APPROXIMATE GROUNDWATER FLOW DIRECTION; <br /> _ APPROXIMATE GRADIENT = 0.007 <br /> MW— I -UNDERGROUND <br /> NA FUEL TANKS <br /> PLANTER '—B. DD <br /> DRIVEWAY <br /> DRNEWAY <br /> TRANSFORMER <br /> e STEVEN E KRCIK W <br /> * No.4976 <br /> 4�OF CAL1F� <br /> MW-6 <br /> —8.25 <br /> PREPARED BY GROUNDWATER ELEVATION CONTOUR MAP, <br /> I JANUARY 19, 1999 FIGURE: <br /> RPBP OIL Sevice Station No. 11193,.M <br /> Rel. 1193bm.dwg engineering contracting firm 3202 Wpest Hammer Lane PROJECT: <br /> 9baem4p from �Wa10 Emg;Meering Croup StocKtOn, California DAC04 <br /> r <br /> i <br />