Laserfiche WebLink
• <br /> ALISTO Field Report / Sampling Data Sheet <br /> ENGINEERING Project No. 10-136-06-003 Date: l °t <br /> GROUP Address 3202W. Hammer Lane _ Day: M�'THF <br /> 1575 TREAT BOULEVARD, SUITE 201 Contract No. G797415 City: Stockton <br /> WALNUT CREEK CA 94598 510 295-1650 FAX 295-1823 Station No. BP 11193 Sampler: <br /> DEPTH TO GROUNDWATER SUMMARY <br /> WELL SAMPLE WELL TOTAL DEPTH TO PRODUCT TIME COMMENTS: ANNUAL/NOVEMBER <br /> ID ID DIAM DEPTH WATER THICK ESS MONITORED <br /> MW-1 `� r I)U S <br /> MW-2 a- • $ \ _ S --3 11 <br /> MW-3 • d ANNUAL <br /> MW-4 17 13, S v ANNUAL <br /> MW-5 '� <br /> MW-6 1. �� -7 <br /> MW-7 p l� S� 17_ D ANNUAL <br /> FIELD INSTRUMENT CALIBRATION DATA �J <br /> pH METER % 4,00 7,00 10,00-SO TEMPERATURE COMPENSATED T N TIMETT_ WEATHER �--y L <br /> D.O. METER ZERO d.Q. SOLUTION BAROMETRIC PRESSURE TEMP _ L7 7- <br /> CONDUCTIVITY <br /> CONDUCTIVITY METER _ 10,000 TURBIDITY METER 5.0 NTU OTHER <br /> LEAK DETECTOR : ALARM MODE NON ALARM MODE <br /> WAIL ID Depth to Wates Dlam Cap/Lock Product Dept irldescence Gal. Time Temp 'F pH E.C. D.Q. 0 EPA 601 � <br /> w--,, 111 -10 T' DICI 0 1 Y ir 7 0. 5' -7•(y 1. C Z PCTPH-G/BTEX--'�k(-L. <br /> otal I]e er Level=} x Well Vol.Factor= x#vol, to Purge. PurgeVpl. As TPH Diesel <br /> �8 �� O l D m 0 TOG 5520 <br /> Purge Method: 0Surface.J2empr-05isp.Tube OWlnch ODlsp. Baller(s)_OSys Port ------ - TIME/SAMPLE ID <br /> Comrrje . <br /> Well ID Depth to Watei Diam Cap/Lock Product Depi Iridescence Gal. Time Temp `F pH E.C. D.O. 0 EPA bpi y� <br /> O ) Y N a q J 7 1 -t )r- ) PTPH-G/BTEX--CAL. <br /> Total Depth-Water Level= x Well Vol.Factor= x#vo, to Purge PurgeVol, (,, ,7- *,'1 Z p 1^5 0 TPH Dlesel <br /> . S - 1 1 , -N S3 X -� '° — Z,PS 3 ='W. -7. p ,,,5 '� 0 TOG 5520 <br /> Purge Method: Osurtace Pump ODIsp.Tube OWinch Aisp. Baller(s)-1 OSYs Port TIME/SAMPLE ID <br /> Comments: <br /> PAGE l OF <br />