Laserfiche WebLink
TABLE 1-SUMMARY OF RESULTS OF GROUNDWATER MONITORING <br /> I <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPN-G TPH-D TPN B T E X MTBE HVOC DO LAB <br /> ID SAMPLING/ ELEVATION (a) WATER ELEVATION (b) (ug/1) (ug/1) (ug/1) (ug/1) (ug/1) (ug11) (ug/1) (ugll) (ug") (ppm) <br /> MONITORING (Feet) (Feet) (Feet) <br /> MW-2 01/20100 482 1326 -844 ND<50 --- ND<O 5 2 ND<O 5 057 5400 --- --- PACE <br /> MW-2 05/04/00 482 1065 -583 560 --- – ND<0 5 ND<0 5 ND<O 5 10 1600 --- --- PACE <br /> MW-2 (m) 07/14/00 482 --- --- --- --- --- — --- -- <br /> Blaine Tech Services Inc, Report 010119-K-1 BP Oil 11193 at 3202 W Hammer Lane Stockton California Page 3 <br />