My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002982
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:18:15 PM
Creation date
1/30/2020 4:50:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002982
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�1 CAMBRIA <br /> Water Sampling <br /> Water samples, if they are collected from the boring, are either collected using a driven <br /> HydropunchO type sampler or are collected from the open borehole using bailers The ground water <br /> samples are decanted into the appropriate containers supplied by the analytic laboratory Samples <br /> are labeled, placed in protective foam sleeves, stored on crushed ice at or below 411C, and transported <br /> under chain-of-custody to the laboratory Laboratory-supplied trip blanks accompany the samples <br /> and are analyzed to check for cross-contamination An equipment blank may be analyzed if non- <br /> dedicated sampling equipment is used <br /> Grouting <br /> If the borings are not completed as wells, the borings are filled to the ground surface with cement <br /> grout poured or pumped through a tremie pipe <br /> MONITORING WELL INSTALLATION, DEVELOPMENT AND SAMPLING <br /> Well Construction and Surveying <br /> . Ground water monitoring wells are installed to monitor ground water quality and determine the <br /> ground water elevation, flow direction and gradient Well depths and screen lengths are based on <br /> ground water depth, occurrence of hydrocarbons or other compounds in the borehole, stratigraphy <br /> and State and local regulatory guidelines Well screens typically extend 10 to 15 ft below and 5 ft <br /> above the static water level at the time of drilling However, the well screen will generally not <br /> extend into or through a clay layer that is at least three ft thick <br /> Well casing and screen are flush-threaded, Schedule 40 PVC Screen slot size varies according to <br /> the sediments screened, but slots are generally 0 010 or 0 020 inches wide A rinsed and graded sand <br /> occupies the annular space between the boring and the well screen to about one to two ft above the <br /> well scieen A two ft thick hydrated bentonite seal separates the sand from the overlying sanitary <br /> surface seal composed of Portland type LH cement <br /> Well-heads are secured by locking well-caps inside traffic-rated vaults finished flush with the ground <br /> surface A stovepipe may be installed between the well-head and the vault cap for additional <br /> security <br /> The well top-of-casing elevation is surveyed with respect to mean sea level and the well is surveyed <br /> for horizontal location with respect to an onsite or nearby offsite landmark <br /> I <br /> Page 2 of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.