My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:06:18 PM
Creation date
1/30/2020 4:51:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002983
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50 <br /> Supplemental Investigation Work Plan <br /> BP Oil Site No. 11193 <br /> C A M B R I A Stockton, California <br /> February 25, 2000 I{ <br /> Migration Control <br /> 1 <br /> TOSCO will submit a proposal for groundwater extraction. The proposal and subsequent progress <br /> reports will be provided by TOSCO under separate cover. ' <br /> t <br /> Quarterly Monitoring ' <br /> The new wells will be added to the quarterly groundwater monitoring program. Water samples will <br /> be analyzed for TPHg by modified EPA Method 8015,and BTEX and MTBE by EPA Method 8020. <br /> I <br /> SCHEDULE <br /> F l <br /> Upon receiving written work plan approval from the SJCEHD,permits will be acquired, access at <br /> the adjacent car wash will be requested, and the field work will be scheduled. The report will be <br /> submitted approximately six weeks after completing the field work. <br /> ATTACHMENTS <br /> Figure 1 —Area Well Survey <br /> Figure 2—Site Plan <br /> Appendix A—Estimated Hydrocarbon and MTBE Mass Removed . <br /> Appendix B Water Well Drillers Report—Caltrans Well <br /> f Appendix C—Standard Field Procedures for Abandoning Monitoring Wells <br /> Appendix D---Standard Field Procedures for Monitoring Wells <br /> HABritish PetroleunAl 1 l93-Stockton\Work Plan\Sripplemental Investigation Work Plan-doe <br /> I <br /> 1 <br /> i <br /> 9 <br /> h <br />
The URL can be used to link to this page
Your browser does not support the video tag.