My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:06:18 PM
Creation date
1/30/2020 4:51:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002983
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> STANDARD FIELD PROCEDURES FOR MONITORING WELLS <br /> This document presents standard field methods for drilling and sampling soil borings and installing, <br /> developing and sampling ground water monitoring wells. These procedures are designed to comply <br /> with Federal, State and local regulatory guidelines. Specific field procedures are summarized below. <br /> SOIL BORINGS <br /> Objectives <br /> Soil samples are collected to characterize subsurface lithology, assess whether the soils exhibit <br /> obvious hydrocarbon or other compound vapor or staining, and to collect samples for analysis at a <br /> State-certified laboratory. All borings are logged using the Unified Soil Classification System by i <br /> a trained geologist working under the supervision of a California Registered Geologist (RG). <br /> i <br /> Soil Boringand Sampling <br /> p g <br /> Soil borings are typically drilled using hollow-stem augers or direct-push technologies such as the <br /> Geoprobe©. Soil samples are collected at least every five ft to characterize the subsurface sediments <br /> and for possible chemical analysis. Additional soil.samples are collected near the water table and <br /> at lithologic changes. Samples are collected using lined split-barrel or equivalent samplers driven <br /> into undisturbed sediments at the bottom of the borehole. <br /> Drilling and sampling equipment is steam-cleaned prior to drilling and between borings to prevent <br /> cross-contamination. Sampling equipment is washed between samples with trisodium phosphate <br /> or an equivalent EPA-approved detergent. <br /> Sample Analysis <br /> Sampling tubes chosen for analysis are trimmed of excess soil and capped with Teflon tape and <br /> plastic end caps. Soil samples are labeled and stored at or below 4°C on either crushed or dry ice, <br /> depending upon local regulations. Samples_are transported under chain-of-custody to a State- <br /> certified analytic laboratory. <br /> Field Screening : <br /> One of the remaining tubes is partially emptied leaving about one-third of the soil in the tube. The <br /> tube is capped with plastic end caps and set aside to allow hydrocarbons to volatilize from the soil <br /> After ten to fifteen minutes, a portable volatile vapor analyzer measures volatile hydrocarbon vapor <br /> concentrations in the tube headspace, extracting the vapor through a slit in the cap. Volatile vapor <br /> analyzer measurements are used along with the field observations, odors, stratigraphy and ground <br /> water depth to select soil samples for analysis. <br /> Page I of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.