Laserfiche WebLink
l <br /> l <br /> ---- <br /> EXPLAW ON: <br /> _- ♦ Groundwater Monitoring Well <br /> 0 Vapor Extraction Well <br /> r <br /> v <br /> Tosco Dispenser Grab <br /> _ - Sample Location <br /> Former <br /> Waste Oil + Tosco Hydro Punch <br /> Tank ' Boring Location <br /> ation <br /> I ------------------------------ <br /> W <br /> Z Area of Potential Over-Excavation <br /> MW-3 J ® of Hydrocarbon-Impacted Soil <br /> MW-4i1 Station ♦ a W <br /> � Building <br /> Waste Oil <br /> Tank a _ <br /> F5 <br /> �. THP-1+ TD-2 TD-3 <br /> Underground W <br /> Storage Tanks o <br /> MW-2 ♦MW-5 o <br /> MW-1 vW_1 <br /> Planter i l <br /> THP-2 <br /> t <br /> 'f Transformer -----___ <br /> P -----` Driveway I <br /> r onYeway <br /> - 1 <br /> ------------------- <br /> DRIVE o ao <br /> KELLY <br /> Sam: Figure Modified From Drawing Provided Scale in Feet <br /> By ENOON Northwest, lns. <br /> Gettler - Ryon Inc, SITE PLAN FIGURE <br /> Tosco 76 Branded Facility No. 11193 <br /> 6747 Sierra Ct., Suite J (925) 551-7555 3202 West Hammer Lane <br /> Dublin, CA 94568 Stockton, California 21 <br /> JOB NUMBER REVIEWED BY DATE REVISED DATE <br /> 140205.03 1.1/98 <br />