Laserfiche WebLink
k i L✓ <br /> -per <br />` 3.4.7 GENERAL. SAFETY E LTIPMENT <br /> i <br />' The following equipment must be available and easily accessible <br /> for use: <br /> First Aid Kit <br /> - Fire extinguishers (Foam, dry chemical or carbon <br /> dioxide) <br /> Each company vehicle is equipped with the following items: <br /> First Aid Kit <br /> Fire Extinguisher <br /> "Stop/Slow" traffic signs <br /> i - warning Triangle/Flare Kit <br /> t <br /> 4 4.9 TRAINING <br /> l ; <br /> All pez-sornel who may be exposed to onsite contaminants must <br /> provide documentation of the following: <br /> I - Current certification of 40 hours of (OSHA) classroom i <br /> { instruction/hands-on training to i ncl udt-f <br /> - Three days of field experience under the supervision an <br /> experienced supervisor. <br /> EiSht hours of annual classroom refresher training_ <br /> i - sight hours of supervisory training it a team member is <br /> a desig:.ated supervisor. <br /> Hazard communications training. <br /> 5.0 PROJECT-SPECIFIC TRAINING <br /> Project-specific training and information will be provided either <br /> before traveling to the site or at the site before entry into the <br /> exclusion zone. The information and training will be documented <br /> and will include the following: <br /> The contents of this Health and Safety Plan <br /> - A discussion of the health and safety hazards; <br /> protective measures and work practices for handling <br /> contaminated soil, water or equipment . <br /> 10 <br />