Laserfiche WebLink
Scott T Hooton <br /> Team Leader <br /> BPAmoco <br /> BP Amoco Oil Corporation <br /> i <br /> 295 SW 41r Street <br /> Bldg 13 Si� <br /> Renton WAj <br /> 4251251 068 /7 <br /> 11 l�fr <br /> '�j //yy <br /> 425/251 0735 FAX /-'� 1:,36 36 <br /> August 24,2000 <br /> San Joaquin County Public Health Services <br /> Attention Ms Carol Oz- Senior REHS <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> RE BP Branded Site No 11193 <br /> 3202 West Hammer Lane <br /> Stockton,CA <br /> Site Code 1129 <br /> Dear Ms Oz <br /> This letter transmits the Third Quarter 2000 Groundwater Monitoring report prepared on behalf of BP by <br /> Blame Tech Services The report summarizes chemical data obtained since 1992, including results <br /> associated with samples recently obtained on July 14,2000 <br /> The report shows that aromatic hydrocarbons were detected in a sample obtained from well VW-1 on July <br /> 14, 2000 MTBE was detected in samples obtained from all of the wells,with the highest concentration <br /> associated with well VW-1 (250,000 Eig/I by Method 8020) <br /> Cambria recently completed the installation of additional monitoring wells and sampling of as irrigation well <br /> located in a nearby Caltrans right-of-way I expect that the report will be submitted within the next four to <br /> six weeks <br /> Gettler-Ryan is understood to have submitted a workplan for batch groundwater extraction from certain <br /> groundwater monitoring wells earlier this year The workplan,submitted on behalf of Tosco, outlines <br /> activities intended to reduce MTBE concentrations detected in the groundwater <br /> Please give me a call at(425)251-0689 if you have any questions or comments <br /> Sincere , <br /> colt Hooton <br /> attachment <br /> cc site file <br /> Khaled Rahman -Cambria(w/attachment) <br /> Tosco Marketing Company,Attention Mr D J Camille,2000 Crow Canyon Place, Suite 400, San <br /> Ramon,CA 94583 (w/attachment) <br />