Laserfiche WebLink
TABLE•MMARY OF RESULTS OF GROUNDWATER MONI • <br /> TORING � .. <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPH-G TPH-D TPH B T E X MTBE HVOC DO LAB <br /> ID SAMPLING/ ELEVATION (a) WATER ELEVATION (b) (ugA) (ugA) (ugn) (ugA) (ug/0 NO) (ug/0 (ugA) (ugll) (ppm) <br /> MONITORING (Feet) (Feet) (Feet) <br /> MW-2 12/21/92 482 21 26 -1644 1500 -- --- 120 96 10 24 _ <br /> MW-2 04/04/93 482 1845 -1363 2600 - 460 13 77 81PACE <br /> MW-2 04/26/93 482 1811 -1329 --- <br /> MW-2 10/05/93 482 1885 -1403 1500 --- --- 3200 120 540 710 — PACE <br /> MW-2 01/07/94 482 1848 -1366 1900 — 400 13 56 79 410 (c) — — PACE <br /> MW-2 04/20/94 482 1782 -1300 18000 -- – 3700 120 610 900 7100 (c) -- 43 PACE <br /> MW-2 04/25/94 482 1780 -1298 --- <br /> MW-2 07/28/94 482 1814 -1332 28000 — 5300 80 750 340 43 PACE <br /> MW-2 12/09/94 482 1871 -1389 32000 – 4000 150 760 60043 PACE <br /> MW-2 03/03/95 482 1735 -1253 2600 (e) – — 540 68 96 64 – — 49 ATI <br /> MW-2 04/12/95 482 1623 -1141 1800 - -- 360 3 3 70 50 7$ ATI <br /> QC-1 (d) 04!12195 – 1900 --- --- 360 32 70 51 – — ATI <br /> MW-2 07/20/95 482 1645 -11 63 8800 (e) — --- 1600 22 290 29064 ATI <br /> QC-1 (d) 07/20/95 -- 7200 (e) -- -- 1300 17 240 240 — – ATI <br /> MW-2 11/02/95 482 1730 -1248 5000 -- -- 780 14 150 140 7900 -- 52 ATI <br /> QC-1 (d) 11/02/95 — 4800 -- -- 840 15 160 140 8400 ATI <br /> MW-2 01/16/96 482 1666 -1184 2000 – -- 300 86 62 48 3200 -- _ ATI <br /> QC-1 (d) 01/16/96 -- — 2000 -- – 290 84 59 44 3000 – – ATI <br /> MW-2 04/22/96 482 1482 -1000 680 --- --- 140 4 36 12 1700 -- SPL <br /> QC-1 (d) 04/22/96 -- 490 — -- 130 3 34 11 2100 -- _ SPL <br /> MW-2 07/12196 482 1512 -10 30 4800 — — 890 19 190 52 19000 — 22 SPL <br /> QC-1 (d) 07/12/96 — -- 5300 -- -- 990 21 220 55 20000 SPL <br /> MW-2 11/14/96 482 1603 -1121 24000 --- --- 590 25 70 ND<25 18000 -- <br /> QC-1 (d) 11/14/96 --- 2 9 SPL— 23000 -- - 570 ND<25 68 ND<25 21000 --- SPL <br /> MW-2 03111/97 482 1286 -8 04 770 --- --- 12 ND<5 0 ND<5 0 ND<5 0 970 — 40 SPL <br /> MW-2 05/22/97 482 1345 -863 2700 --_ - 76 1 2 9 3 21 3100 - 4 2 5PL <br /> QC-1 (d) 05/22/97 2800 — -- 77 1 1 95 21 3400 SPL <br /> MW-2 08/06/97 482 1432 950 -- -- <br /> MW-2 09/22/97 482 1341 -859 2400 _-- -- --- 6 3 -- <br /> — --- 730 10 79 74 2100 65 SPL <br /> MW-2 01/07198 482 1437 -955 16 -- — 90 ND<5 0 ND<5 0 ND<5 0 17000 -- 60 SPL <br /> QC-1 (d) 01/07/98 -- 12 -- — 110 ND<1 0 ND<1 0 23 18000 SPL <br /> MW-2 07101/98 482 1078 596 1200 --- -- 22 ND<1 0 21 ND<1 0 4900 --- 48 SPL <br /> QC-1 (d) 07/01/98 --- 1000 --- --- 22 ND<10 19 ND<10 4800 SPL <br /> MW-2 09/18/98 482 1251 769 12000 -- – 69 1 8 ND<100 7 7 14000 – 5 6 SPL <br /> QC-1 (d) 09118198 – 13000 — — 56 1 7 ND<100 59 15000 SPL <br /> MW-2 01119/99 482 1251 769 3500 -- --- ND<1 0 ND<1 0 ND<1 0 ND<1 0 3600SPL <br /> MW-2 0) 10/14/99 482 1339 -857 ___ <br /> MW-2 01/20/00 482 1326 -844 ND<50 -- ND<O 5 2 ND<O 5 057 5400 -- -- PACE <br /> h <br /> Blaine Tech Serwes,Inc,Report 000120-Y-1, BP Oil 11193 at 3202 W dammer Lane Stockton Cahfomia Page 2 <br />