My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:18:11 PM
Creation date
1/30/2020 4:52:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002986
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> l n <br /> ARCO AM/PM <br /> SERVICE STATION <br /> SCALE (FT) <br /> PRIVATE ROAD <br /> 0 30 <br /> ixMW-3 I I <br /> B <0 5 I MW-7 <br /> T <0 5 <br /> i<iO <br /> E <0 5 B <0 51 <br /> 5 X <05 T <05 ) <br /> 5 TPHg <50 E 20 <br /> 5 SERVICE MTBE 900 X D 69 I <br /> 5 MW-4 STATION * MW-3 w TPHg <50 <br /> TPHg <50 r BUILDING MTBE 690 5 ¢ MTBE 58 <br /> MTBE 9 7 I I a 1 J MTBE* 39 i <br /> MTBE* 6 6 L J DISPENSER <br /> I ISLANDS I W MW-'7 <br /> UNDERGROUND : <br /> USED OIL TANK Q ' EXPLANATION <br /> _ 0 ' MONITORING WELL <br /> TPHg I TOTAL PETROLEUM HYDROCARBON CALCULATED <br /> • w-2 LLJ IAS GASOLINE IN PARTS PER BILLION (ppb) <br /> l NA MW_5 o B ' BENZENE, ppb <br /> T I TOLUENE, ppb <br /> 4 f E I ETHYLBENZENE, ppb <br /> l � _ X I XYLENE, ppb <br /> VW_ MTBE ' METHYL—TERT—BUTYL—ETHER, ppb <br /> L — NA MW-5 MTBE* MTBE BY EPA 8260 <br /> MIN-1 �UNDERGROU D H <0 5 <br /> FUEL TANKS T <0 5 NA ' DATA NOT AVAILABLE <br /> E <0 5 <br /> PLANTER ! <br /> DRIVEWAY X, <0 5 <br /> TPHg <50 ; <br /> pRNEWAY MW-2 MW-6 MTBE 5 0 f <br /> TRANSFORMER B <0 5 B <0 5 M-1 BE* 3 8 <br /> T 20 T <05 <br /> E <0 5 E <0 5 <br /> X 057 X <0 5 <br /> TPHg <50 TPHg <50 I <br /> MTBE 5400 MTBE 33 t <br /> MTBE* 3800 MTBE* 26 <br /> k <br /> i <br /> MW-6 <br /> PREPARED BY <br /> �1 HYDROCARBON CONCENTRATION MAP, <br /> FIGURE <br /> ,JANUARY 20, 2000 2 <br /> PvRM BP OIL Service Station No 11193 <br /> 11 32D2 West Hommer Lane PROJECT <br /> I map9from Also Engineering Group engineering contracting firm � pAC04 <br /> (Stockton California <br /> I � <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.