Laserfiche WebLink
a. Describe the method that will be andlor IqM the tank(s� 1 <br /> t <br /> nth <br /> b_ Tank/Piping Hauler. <br /> Named <br /> Address 1 PSS LV �r9 \C"���1 U t\� zip <br /> Phone No4 5 - 1-2, <br /> Hauler Registration ff(11 hauled as hazardous <br /> c. Tank0ping Dlsposal Site: <br /> Name <br /> Address 2,5 �J 1~-�Z U� _—clt'9E\ tJ ll f�� Zip <br /> Phone No 5{ <br /> EPA Mf(if transported to a permitted TSD facility) L, ��QC-> -2h <br /> o �o 2 <br /> Is the sampling firm an independent third party from the contractor? YES NO(] <br /> Describe,in detail,how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br /> b P\(-N.1, IA •7- S Tr> <br /> Describe how the excavation will be backfilled with suitable material upon removal: <br /> 1 M I ?Z—i Ise.\ \ -s N C L�--IiN <br /> Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> V nl t= - <br /> b)What will be the final destination of the excavated stockpile? <br /> F. C1 <br /> C)Contaminated Soil Hazardous Waste Hauler. <br /> Name f 1 Hauler Registration <br /> Address �. ��p,Z`c� Lv� City R�c\�M0�1 N zip <br /> Phone No. <br /> M 046(Revised 10119198) Page 5 <br />