My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 9:53:05 AM
Creation date
1/31/2020 8:26:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I• <br /> Page 1 of 2 <br /> Vicki McCartney [EH] <br /> From: Wynne, Dan [Dan.Wynne@shawgrp.com] <br /> Sent: Monday, January 09, 2006 2:50 PM <br /> To: Wynne, Dan; Vicki McCartney [EH] <br /> Cc: Harman, Larkin; Radonich,Anna; Brenda <br /> Subject: RE: parkinson's ARCO 3250 w Hammer Lane' <br /> I don't think the map link worked. <br /> Dan Wynne <br /> Tel 916 565 4184 <br /> From: Wynne, Dan <br /> Sent: Monday, January 09, 2006 2:49 PM <br /> To: 'Vicki McCartney [EH]' <br /> Cc: Harman, Larkin; Radonich, Anna; 'Brenda' <br /> Subject: RE: parkinson's ARCO 3250 w. Hammer Lane <br /> Vicki: <br /> (Here is an link to aerial photo view from a website. It is a great pic if you can wait for 200K file download <br /> http://www.mai)mart.com/scats/hsrun.exe/Single/MapMart New/MapXtreme.htx;start=HS_Handier <br /> Shaw and Woodward Drilling have looked at the logistics of the site with respect to putting in a monitoring well <br /> with permanent conductor casing, at the location of CPT-3. <br /> Last week we discovered the CPT-3 was directly beneath a phone line. The phone line is at 29 to 31 feet off the <br /> ground at that spot There is a low V (voltage) line above it, at—41 feet.above the ground, and a higher V line <br /> above that, at—47 feet above the ground. The drill rig will be at 35ft &6inches"mast up". The driller's and <br /> Shaw's safety protocols require a minimum of 10 feet standoff. <br /> We are trying to contact PG&E to get exact voltages and do some calcs to determine safe minimum standoff for <br /> reasonable weather conditions. <br /> »I am sure we could install the well at a location 15 feet to the south of CPT-3. <br /> We also considered installing the well north of CPT-3. To do this we'd need to close the curb lane of Hammer <br /> Lane for 6 to 8 business days. Even worse, you can see that this is"downstream"of a freeway offramp, so it <br /> would be a major hassle probably involving closure permits with city, county and Caltrans. <br /> Please check with Nuel to see if the proposed plan still meets requirements and let me know! <br /> *****************Internet Email Confidentiality <br /> Footer****************** <br /> Privileged/Confidential Information may be contained in this <br /> message. <br /> 1/9/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.