My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 9:53:05 AM
Creation date
1/31/2020 8:26:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> $EkVICES <br /> PUBLIC:, HEALTH <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> JIM PARKINSON <br /> PARKINSON'S ARCO <br /> 3250 W HAMMER LN <br /> STOCKTON CA 95209 <br /> RE: Parkinson's ARCO <br /> 3250 W.Hammer Ln. <br /> Stockton,CA <br /> WORKPLAN: Work Plan for 5-Day Dual Phase Extraction Event Installation of Two Down Gradient <br /> Wells.and One Deep Soil Boring DATED: 12/12/01 <br /> PREPARED BY: IT Corporation <br /> APPROVED X <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S 25299.37,subd.(c)(3).): <br /> 1. Installation of 2 groundwater monitoring wells in the access easement road between the ARCO and the <br /> neighboring 76 Station. <br /> 2. Advancement of one,on-site,continuous core soil boring to a total depth of approximately 80 feet below <br /> surface grade for vertical definition of contamination. <br /> 3. Conduct a 5-day,dual phase extraction(DPE) feasibility test using a mobil DPE system. <br /> COMMENTS AND CONDITIONS: <br /> 1. DPE system will run continuous 24 hrs.per day for the 5 days. <br /> '2. In order to achieve the proposed draw down of 10 feet,groundwater may need to be extracted at a higher <br /> rate. Extra storage for extracted groundwater may be needed. <br /> 3. Laboratory analysis of vapor and groundwater samples for total petroleum hydrocarbons,BTEX,and fuel <br /> oxygenating compounds. <br /> 4. Notify PHS/EHD at least 48 hours prior to the proposed scheduled work dates. <br /> DATED 1Z BY <br /> Sam Savig E <br /> LOP/Site Mitigation Unit IV <br /> Cc: CVRWQCB—Marty Hartzell <br /> Mike Sgourakis—IT Corporation <br /> i <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.