Laserfiche WebLink
ozone sparging at this site. rhis work plan would .lay out a plan for <br /> the installation of several sparge wells and provide details on the <br /> design, permitting, equipment, monitoring and reporting plan, and <br /> implementation schedule for the ozone .system. Depending-on our <br /> evaluation during the preparation of this work plan, we may propose <br /> limited-duration ozone remedial .events using a mobile unit, rather than <br /> the installation of a permanent system. If either the Water Board -or <br /> SJC would like to have a meeting to more thoroughly discuss the site and <br /> how we can proceed from here, we would be happy to do that as well. <br /> Please let me know your thoughts on this, as well as any specific <br /> concerns or requirements that the RWQCB has related to ozone sparging at <br /> this. site.. <br /> Thanks for your time. Have a good day! <br /> -sarah <br /> Sarah O. Salcedo, P.G. <br /> Senior Geologist / Project Manager <br /> Stratus Environmental, Inc. <br /> 3330 Cameron Park Drive, Suite 550 <br /> Cameron Park, California 95682 <br /> (530) 313-9966 -- voice <br /> (530) 676-6005 --' fax <br /> i <br /> i <br /> i <br /> I <br /> 4 <br />