My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 9:53:05 AM
Creation date
1/31/2020 8:26:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v C <br /> chromium, bromine, etc and/orYilot testing of this technology. <br /> I would like RWQCB's approval to submit a work plan to proceed with ozone sparging at this <br /> site. This work plan would lay out a plan for the installation of several sparge wells <br /> and provide details on the design, permitting, equipment, monitoring and reporting plan, <br /> and implementation schedule for the .ozone system. Depending. on our evaluation during the <br /> preparation of this work plan, we may propose limited-duration ozone remedial events using <br /> a mobile unit, rather than the installation of a permanent system. If either the Water <br /> Board or SJC would like to have a meeting to more thoroughly discuss the site and how we <br /> can proceed from here, we would be happy. to do that as well. <br /> Please let me know your thoughts on this, as well as any specific concerns or requirements. <br /> that the RWQCB has related to ozone sparging at this site. <br /> Thanks for your time. Have a good day! <br /> -sarah <br /> Sarah O. Salcedo, P.G. <br /> Senior Geologist / Project Manager <br /> Stratus Environmental, Inc. <br /> 3330 Cameron Park Drive, Suite 550 <br /> Cameron Park, California 95682 <br /> (530) 313-9966 -- voice <br /> (530) 676-6005 -- fax <br /> I <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.