Laserfiche WebLink
v C <br /> chromium, bromine, etc and/orYilot testing of this technology. <br /> I would like RWQCB's approval to submit a work plan to proceed with ozone sparging at this <br /> site. This work plan would lay out a plan for the installation of several sparge wells <br /> and provide details on the design, permitting, equipment, monitoring and reporting plan, <br /> and implementation schedule for the .ozone system. Depending. on our evaluation during the <br /> preparation of this work plan, we may propose limited-duration ozone remedial events using <br /> a mobile unit, rather than the installation of a permanent system. If either the Water <br /> Board or SJC would like to have a meeting to more thoroughly discuss the site and how we <br /> can proceed from here, we would be happy. to do that as well. <br /> Please let me know your thoughts on this, as well as any specific concerns or requirements. <br /> that the RWQCB has related to ozone sparging at this site. <br /> Thanks for your time. Have a good day! <br /> -sarah <br /> Sarah O. Salcedo, P.G. <br /> Senior Geologist / Project Manager <br /> Stratus Environmental, Inc. <br /> 3330 Cameron Park Drive, Suite 550 <br /> Cameron Park, California 95682 <br /> (530) 313-9966 -- voice <br /> (530) 676-6005 -- fax <br /> I <br /> 2 <br />