My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:06:43 AM
Creation date
1/31/2020 8:38:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT IV LOP <br /> NO FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> ` 9/15/12 <br /> SITE ADDRESS: 32 SQ Yy l flam m mer L a n e— <br /> LOP STAFF: C Y <br /> SITE NAME: n Snn 's T - 5 ikC Sery i 3±a1_i17-n <br /> DATE: <br /> IIJ4113 NFA requested by RP or LOP Staff reviewed site with PG and determined it qualifies for NFA. <br /> „f IJ A -- G-ta est s f4 <br /> 4 2S LOP Staff verified GeoTracker(GT)"Closure Review screen still marked "No" at"is This Case Ready for Closure?"eZ <br /> 7-7c <br /> 311ill LOP Staff advises CVRWQCB of NFA consideration. <br /> LOP staff and PG/PC discuss NFA consideration with CVRWQCB at Unit Meeting, by phone, or e-mail. <br /> 2 13 LOP Staff drafts Case Closure Summary(CCS). <br /> /3LOP Staff has CCS verified by `third party' staff member. CCS Reviewed by <br /> 1 ) LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA that includes the CCS. <br /> 411 LOP Staff submits 30-day CVRWQCB NFA with CC to water purveyor to PC for review and signature. <br /> Copy of 30-day letter and CCS sent to: CiIf4 a-Y J4-6644rr, (name of water purveyor) <br /> CVRWQCB 30-day response date up on: Jw,e, lo,zo13 concurrence received on: S z3 I a _ <br /> 30-day extension requested to: Non-concurrence letter from CVRWQ B Management <br /> 'received on: Staff up loads CVRWQCB letterwithout CCS into GT on S/ <br /> which begins Public Participation Notice notification of 35 days. <br /> Documentation received, filed, and flagged that indicates the"current record owner(s) of fee title to the site have <br /> been notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this <br /> documentation. <br /> py&&j LOP Staff directs RP to destroy all wells, remove all site waste material, and provide documentation that the waste <br /> material was properly disposed, LOP staff reviews and approves work plan for well destruction. Destruction permits <br /> issued after 60 days of posting of the Closure Public Notice. Permits issued on 7- 3o - 13 <br /> 9- i3 LOP Staff documents destruction of all monitoring wells. GT"Groundwater Monitoring" screen updated to indicate <br /> wells are destroyed. The NFA closure letter may not be issued until wells are destroyed. <br /> Is-14-13 LOP Staff verifies and flags documentation received indicating all onsite waste material removed and properly <br /> disposed and verified with EHD accounting all SR& D site fees have been paid. The NFA closure letter may <br /> not be issued without this documentation. GT"Closure Review" screen marked "Yes" at"Is This Case Ready <br /> for Closure?" <br /> tz I l� <br /> P� reviews file with flagged documents by LOP Staff and approves clerical issuance of NFA and CCS for <br /> �,�Director's signature. <br /> �Z.II(d l/ LOP staff provides name and addresses of all RPs to the Clerical. Clerical generates a NFA and CCS to be signed <br /> by Director for each RP (not consultants). NFA& CCS generated only if PG/PC signed off above. Signed CCS <br /> and NFA are copied. Originals mailed to RP. Copies filed into LOP File, given to Management, and given to staff to <br /> upload into GT. <br /> Clerical staff updates Envision to reflect site is Closed. <br /> LOP staff pulls all site files for clerical staff to file in LOP Closed File cabinets until scanned into Questys. <br /> LOP staff updates GT"Project Information" screens to reflect site status as Closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.