My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Vicki McCartney,SJCEHD August 29,2008 <br /> Work Plan for Bench-Scale Test and Injection Well Installation Project No.2046-3250-01 <br /> Parkinson's I-5 ARCO Service Station,Stockton,California <br /> Page 6 <br /> testing, the extent of the effects and the time required to reverse the effects (via attenuation) will <br /> be estimated during the bench-scale testing. <br /> To facilitate bench-scale testing, the collection of soil and groundwater samples is required. <br /> Since a drilling event will be required to obtain the required soil samples for a bench-scale test, it <br /> will be most cost-effective to use this drilling event to also install two 03 injection wells for use <br /> during the pilot-scale phase of work. Therefore, Stratus proposes to advance two soil borings <br /> and install dedicated 03 injection wells within the resultant boreholes (IW-1 and IW-2; Figure 2). <br /> The locations of the proposed wells were selected to target 03 injection in the areas east of the <br /> fuel-dispensers (MTBE and TBA plumes) and south of the USTs (MTBE plume). In addition, <br /> the locations of the proposed injection points are strategically located to allow for the use of <br /> existing monitoring wells as observation wells during the pilot-scale testing. A work plan <br /> detailing the pilot-scale testing procedures and protocols will be prepared and submitted to <br /> SJCEHD under separate cover, once the bench-scale testing is complete. Details associated with <br /> bench-scale testing and soil boring/well installations are discussed in the subsequent sections. <br /> PROPOSED SCOPE OF WORK <br /> The proposed scope of work has been subdivided into four general tasks, as outlined below. All <br /> work will be conducted under the direct supervision of a State of California Professional <br /> Geologist or Professional Engineer, and will be conducted in accordance with standards <br /> established by the Tri-Regional Board Staff Recommendations of Preliminary Investigation and <br /> Evaluation of Underground Tank Sites (RWQCB, April 2004). A California-licensed C-57 <br /> drilling contractor will perform all drilling and well construction activities. Stratus' Field <br /> Practices and Procedures that will be utilized during the investigation are included in <br /> Appendix A. <br /> Task 1: Pre-Field Activities <br /> Following receipt of SJCEHD's concurrence with the activities proposed in this work plan, the <br /> following activities will be completed: <br /> ■ Obtain well installation permits from SJCEHD. - <br /> ■ Retain and schedule a licensed C-57 drilling contactor. <br /> ■ Update the health and safety plan for the site. <br /> ■ Physically mark the drilling locations, and contract a private utility locating company and <br /> Underground Service Alert to locate underground utilities in the vicinity of the work site. <br /> ■ Notify the SJCEHD and the property owner of the scheduled field activities. <br /> K:\Parkinsons Hammer 1-5 Arco\Work Plans\Work Plan for Ozone Bench Scale Test.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.