My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Vicki McCartney Project No.: 880.040.1A.0110 <br /> May 23, 2003 <br /> Page 8 <br /> understanding of site geologic and hydrogeologic conditions, including defining <br /> individual water-bearing zones (if present), and the degree of interconnection between <br /> these zones. Geologic cross-sections will be refined, incorporating the new information. <br /> All available recent groundwater analytical data(from quarterly groundwater monitoring <br /> and Hydropunch data) will be evaluated to assess the lateral and vertical extent of <br /> impacts to groundwater. Site maps will be prepared showing the monitoring points and <br /> groundwater analytical results. <br /> SCHEDULE <br /> Shaw will initiate the proposed scope of work on this project following approval of the <br /> work plan by the SJCEHD. Shaw anticipates that field work will be completed within <br /> 45 days of work plan approval, with completion of the final report within 45 days of the <br /> end of field work. Any delays in obtaining the necessary permits or scheduling the <br /> drilling contractor will alter this schedule. <br /> If you have any questions or require additional information, please contact <br /> Mr. Chevlen at (916) 565-4353, or Mr. Herzog at(916) 565-4377. <br /> Sincerely, <br /> SHAW ENVIRONMENTAL, INC. <br /> Benjamin Chevlen David W. Her2g R.G. 7211 <br /> Staff Geologist Project Manager <br /> OEQ10 <br /> `0 <br /> ca G'i <br /> No.7211 <br /> SHAW ENVIRONMENTAL,INC. <br /> N:\sacDP\2003\Prj\880\8800401 A.3ac:doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.