Laserfiche WebLink
Ms. Vicki McCartney Project No.: 880.040.1A.0110 <br /> May 23, 2003 <br /> Page 8 <br /> understanding of site geologic and hydrogeologic conditions, including defining <br /> individual water-bearing zones (if present), and the degree of interconnection between <br /> these zones. Geologic cross-sections will be refined, incorporating the new information. <br /> All available recent groundwater analytical data(from quarterly groundwater monitoring <br /> and Hydropunch data) will be evaluated to assess the lateral and vertical extent of <br /> impacts to groundwater. Site maps will be prepared showing the monitoring points and <br /> groundwater analytical results. <br /> SCHEDULE <br /> Shaw will initiate the proposed scope of work on this project following approval of the <br /> work plan by the SJCEHD. Shaw anticipates that field work will be completed within <br /> 45 days of work plan approval, with completion of the final report within 45 days of the <br /> end of field work. Any delays in obtaining the necessary permits or scheduling the <br /> drilling contractor will alter this schedule. <br /> If you have any questions or require additional information, please contact <br /> Mr. Chevlen at (916) 565-4353, or Mr. Herzog at(916) 565-4377. <br /> Sincerely, <br /> SHAW ENVIRONMENTAL, INC. <br /> Benjamin Chevlen David W. Her2g R.G. 7211 <br /> Staff Geologist Project Manager <br /> OEQ10 <br /> `0 <br /> ca G'i <br /> No.7211 <br /> SHAW ENVIRONMENTAL,INC. <br /> N:\sacDP\2003\Prj\880\8800401 A.3ac:doc <br />