Laserfiche WebLink
TABLE 1 <br /> WELL CONSTRUCTION AND SOIL BORING DETAILS <br /> Parkinson's I-5 Hammer ARCO <br /> 3250 West Hammer Lane,Stockton,-California <br /> Well Boring Boring'-. Well Well Screen Slot <br /> I.D. Date Depth Diameter Diameter Depth Interval Size Drilling Method- Consultant <br /> (feet) (inches) (inches) (feet) (feet bgs) (inches) <br /> Groundwater Monitoring Wells <br /> MW-1 09/06/00 26,"ZS 8 2 25 10-25 0.020 HSA IT Corporation <br /> MW-2 09/06/00 26- 8 2 25 10-25#" 0.020 HSA IT Corporation <br /> MW-3 09/06/00 26-- 8 2 25 10-25/" 0.020 HSA IT Corporation <br /> MW-4 05/23/02 26.5-2-7 8 2 25 10-25,11' 0.020 HSA IT Corporation <br /> MW-5 05/23/02 26.5-,1-,? 8 2 25 10-25 e_ 0.020 HSA IT Corporation <br /> MW-6 07/18/06/ 64 15/8 2 62.5 57.5-62.5 0.020 HSA(with conductor) Stratus <br /> Soil Borings <br /> GP-1 08/16/00 32> 2 -- -- -- -- Direct Push IT Corporation <br /> GP-2 08/16/00 28/ 2 -- -- -- -- Direct Push IT Corporation <br /> GP-3 08/15/00 28✓� 2 -- -- -- -- Direct Push IT Corporation <br /> GP-4 08/15/00 28 ; 2 -- -- -- -- Direct Push IT Corporation <br /> GP-5 08/16/00 30 // 2 -- -- -- -- Direct Push IT Corporation <br /> SB-Deep 05/22/02 56 unknown -- -- -- -- HSA IT Corporation <br /> CPT-1 09/03/03 90 2 -- -- -- -- Direct Push/CPT IT Corporation <br /> CPT-2 09/02/03 90 2 -- -- -- -- Direct Push/CPT IT Corporation <br /> CPT-3 09/02/03 90 2 -- -- - -- Direct Push/CPT IT Corporation <br /> CPT-4 09/03/03 90 2 -- -- -- -- Direct Push/CPT IT Corporation <br /> ENotesow stem auger <br /> August 2008 Workplan---Table 1 Paget of l STRATUS <br />