Laserfiche WebLink
IDSequoia _ 819 Striker Avenue-Suite <br /> Analytical <br /> a , Sacramento,CA 958: <br /> Analytical _ (916)921-96( <br /> FAX(916)921-01( <br /> IT Corporation-Sacramento Project: Parkinson ARCO Sampled: 1/26/00 <br /> 1433 N.Market Blvd.,Ste. 1 Project Number: 880-040.1A Received: 1/27/00 <br /> Sacramento,CA 95834 Project Manager: Kathleen Waldo Reported: 2/9/00 <br /> ANALYTICAL REPORT FOR S001351 <br /> Sample Description Laboratory Sample Number Sample Matrix Date Sampled <br /> D-1 @9' S001351-01 Soil <br /> 1/26/00. <br /> D-1 @ 10'C S001351-02 Soil <br /> 1/26/00 <br /> D-1@10'W S001351-03 Soil <br /> 1/26/00 <br /> D-1 @9 N 5001351-04 Soil 1 <br /> 1/26/00 <br /> D-1 @ 10'E S001351-05 Soil 1/26/00 <br /> D-3@4.5'C S001351-06 Soil 1/26/00 <br /> D-5@5'C S001351-07 Soil 1/26/00 <br /> D-8@8'C S001351-08 Soil 1/26/00 <br /> D-8@8'SW S001351-09 Soil 1/26/00 <br /> D-8@8'SE S001351=10 Soil 1/26/00 <br /> D-8@8'NE S001351-11 Soil 1/26/00 <br /> SPO-(1-4)Composite S001351-12 Soil 1/26/00 <br /> Sequoia Analytical-Sacramento The results in this report apply to the samples analyzed in accordance with the chain ofcustody document. <br /> This analytical report must be reproduced in its entirety. <br /> Page 1 of 16 <br />