Laserfiche WebLink
January 10, 2000 Corporation <br /> Page 3 A Member of The IT Group <br /> Laboratory Procedures <br /> Soil samples (and the groundwater grab sample, as appropriate) collected during over excavation <br /> activities will be submitted to the laboratory and analyzed for the presence of total petroleum <br /> hydrocarbons calculated as gasoline (TPH-g), benzene, toluene, ethylbenzene, xylenes (BTEX..:, <br /> compounds), and fudl-bxygenates j In addition, selected soil samples will be analyzed for 1,2- <br /> dichloroethane (1,2-DCA), ethylene dibromide (EDB) and-total lead. If total lead results are over <br /> 50 parts per million samples will be analyzed for STLC..lead- <br /> Reporting and Schedule <br /> After completion of the field work and laboratory analyses, the data will be evaluated and <br /> assembled into a report. Included in the report will be soil (and groundwater) analytical results, <br /> chain-of-custody documentation, a summary of field activities and observations, manifests and <br /> destination of soil, and conclusions. This report will be submitted to the SJCEHD within 6 to 8 <br /> weeks of receiving analytical results from the laboratory. <br /> If there are any questions regarding the contents of this work plan, please call us at (916) 928- <br /> 3300. <br /> Sincerely, <br /> IT Corporation <br /> Kathleen A. Waldo <br /> Staff Engineer <br /> Mark Capps <br /> Project Geologist <br /> RG 6561 <br /> Attachments: Figure 1 - Site Map <br /> Attachment A - Field and Laboratory Procedures <br /> Attachment B - Site Health and Safety Plan <br /> cc: Mr. Jim Parkinson, 3250 West Hammer Lane, Stockton, CA <br /> Mr. Michael Kith, SJCEHD <br /> 880-040.1A/Workplan <br />