My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002906
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
ARCHIVED REPORTS_XR0002906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:10:01 AM
Creation date
1/31/2020 9:10:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002906
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
View images
View plain text
Shaw Environmental 8. Infrastructure, Inc <br /> 1326 North Market Boulevard <br /> Sacramento, California 95834 <br /> D <br /> LS� � <br /> YE <br /> n9169283300 <br /> FAX 916 565 4356 <br /> S�11��1 The Shaw Group Inc' NOV 0 gg4 <br /> E WRONMENT <br /> PERM1T/SERVICESTH November 8, 2004 �` 4 <br /> Project No 880-040 1A.02010000 <br /> Ms Vicki McCartney U �Al <br /> eSan Joaquin County Public Health Services <br /> Environmental Health Division <br />' 304 East Weber Avenue <br /> Stockton, California 95202 <br />' Re Fourth Quarter 2004 Groundwater Monitoring Report, Parkinson's Hammer <br /> 1-5 Arco, 3250 West Hammer Lane Stockton, California <br /> Dear Ms McCartney <br /> On behalf of Parkinson's Hammer I-5 Arco, Shaw Environmental, Inc (Shaw) presents <br /> the results of the fourth quarter 2004 groundwater monitoring event for the above <br /> referenced site <br />' SITE BACKGROUND <br /> The site is located at 3250 West Hammer Lane, east of Interstate 5 in Stockton, <br />' California The site is a privately owned Arco-branded service station that has retailed <br /> gasoline fuel for approximately 14 years The site currently includes three 12,000-gallon <br /> capacity gasoline underground storage tanks (USTs) and associated product lines and <br /> dispensers Diesel fuel has never been dispensed at the site <br /> On January 7, 2000, the station began product line upgrades After the removal of <br /> dispenser plumbing, soil impacted by petroleum hydrocarbons was discovered below the <br />' western dispenser islands Soil samples were collected from beneath the dispensers and <br /> along the product lines at a depth of approximately 3 5 feet below ground surface (bgs) <br />' Remedial activities conducted on January 26, 2000, included removal of approximately <br /> 262 tons of impacted soil in the area below dispenser and product lines Excavation <br /> E <br /> 1 N 1sacDP120041Prj188018800401 A 4ae doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).