My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002919
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
ARCHIVED REPORTS_XR0002919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:33:58 AM
Creation date
1/31/2020 9:26:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002919
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j <br /> Ms Margaret Lagorio Project 880-040 IA <br /> August 29, 2002 <br /> Page 4 <br /> CONCLUSIONS <br /> Groundwater levels have decreased approximately 10 foot since the second quarter <br /> 2002 sampling event Generally, groundwater results showed a decrease or stable TPH- <br /> g, BTEX, and MtBE concentrations trend for the three onsite wells The TBA increase in <br /> 4 MW-2 and MW-3 reported in the second quarter 2002 was anomalously high and current <br /> groundwater concentrations have returned to historical levels <br /> RECOMMENDATIONS <br /> On May 22, 2002 a deep boring was installed adjacent to well MW-1 to the total depth <br /> of 54-feet bgs to define the vertical extent of MtBE in soil and groundwater at the site <br /> On May 23, 2002 two monitoring wells (MW-4 and MW-5) were installed at the <br /> locations shown on Figures 1 and 2 A dual phase extraction test was conducted from the <br /> morning of June 10, 2002 through the morning of June 15, 2002 by TRC Alton <br /> Geoscience, Inc The results of this investigation as well as conclusions and <br /> recommendations for the next phase of work will be included in the Additional <br /> Assessment and Interim Remediation Report <br /> If there are any questions regarding the contents of this report, please call <br /> Kathleen Waldo at (916) 565-4370, or Sue Kraemer at (916) 565-4180 <br /> Sincerely, <br /> SHAW ENVIRONMENTAL& INFRASTRUCTURE, INC <br /> Kathleen A Waldo Sue Kraemer, CEG 1666 <br /> Staff Engineer Senior Geologist <br /> Shaw Environmental&Infrastructure,IncSAC W 1sacDP120021PR]1Pl8188018800401A tab doc-021ms 3 <br /> (01070000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.