My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002920
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
ARCHIVED REPORTS_XR0002920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:34:42 AM
Creation date
1/31/2020 9:27:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002920
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Sam Savig Project 880-040 IA <br /> June 12, 2002 <br /> 1 Page 4 <br />' CONCLUSIONS <br /> Groundwater levels have increased 0 09 feet since the first quarter 2002 sampling event <br /> Generally, groundwater results showed a decrease or stable TPH-g, BTEX, and MtBE <br /> concentrations trend for the three wells The TBA increase for MW-2 and MW-3 was <br /> anomalously high and will be reviewed next quarter for confirmation <br /> rRECOMMENDATIONS <br /> A work plan was approved by SJCEHD to define the vertical and lateral extent of soil <br /> and groundwater contamination and implement interim remedial measures to control the <br /> off-site MtBE migration Installation of two down gradient wells and the completion of <br /> a dual phase extraction test is scheduled for the second quarter 2002 <br /> If there are any questions regarding the contents of this report, please call <br /> Kathleen Waldo at (916) 565-4370, or Sue Kraemer at(916) 565-4180 <br /> Sincerely, <br /> SHAW ENVIRONMENTAL & INFRASTRUCTURE, INC <br /> r <br /> Kathleen A Waldo Sue Kraemer, CEG 1666 <br />' Staff Engineer Senior Geologist <br /> Attachments Table i —Groundwater Elevation and Analytical Data <br /> Figure 1 —Groundwater Elevation Contour Map, Second Quarter 2002 <br /> Figure 2 —TPH-gBenzene/MtBE Concentration Map, Second <br /> I Quarter 2002 <br /> Attachment A—Field And Laboratory Procedures <br /> Attachment B— Certified Analytical Reports, Chain-of-Custody <br /> Documentation, and Field Data Sheets <br /> cc Mr Jim Parkinson, 3250 West Hammer Lane, Stockton, California <br />' ha <br /> SAC IN franc£p11Projeds\Projeds1880104011a10107120021880040_2g02 doo-021R 1 Sw Environmental&lnfrastructirre,Inc <br /> (01070000) <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.