Laserfiche WebLink
I <br /> l <br /> r, �I <br /> Mr Sam Savig Project No 880-040 IA <br /> February 21, 2002 <br /> Page 4 <br /> RECOMMENDATIONS <br /> A work plan was approved by SJCPHS/EHD to define the vertical and lateral extent of <br /> soil and groundwater contamination and begin interim remedial measures to control the <br /> off-site migration of MtBE The work plan will be implemented during the second <br /> quarter 2002 <br /> If there are any questions regarding the contents of this report, please call <br /> Kathleen Waldo at(916) 565-4370 or Sue Kraemer at (916) 565-4180 EE <br /> .•NF1 Cq•• <br /> Sincerely,;'•� '.��p <br /> SUSANNE M( KRAEMER 9� <br /> IT CORPORATIONv; NO 1666 n <br /> e <br /> 3 0303•= <br /> CI'+.Lso <br /> Kathleen A Waldo Sue Kraemer, CEG, 1666 <br /> Staff Engineer Senior Geologist <br /> Attachments Table 1 — Groundwater Elevation and Analytical Data <br /> Figure 1 — Groundwater Elevation Contour Map, First Quarter 2002 <br /> Figure 2—TPH-g/Benzene/MtBE Concentration Map, First <br /> Quarter 2002 <br /> Attachment A—Field And Laboratory Procedures <br /> Attachment B —Certified Analytical Reports, Chain-of-Custody <br /> Documentation, and Field Data Sheets <br /> cc Mr Jim Parkinson, 3250 West Hammer Lane, Stockton, California <br /> IT CORPORATION <br /> SAC 1N 1sacDP120021PRJ\Pi8188018800401A 2aa doc-011it 1 <br /> (01070000) <br />