Laserfiche WebLink
Ms Carol Oz Project 880-040 IA <br /> December 5, 2000 <br /> Page 5 of 6 <br /> Well installation soil analytical data is summarized in Table 3 and on Figure 6 Laboratory <br /> reports with COC documentation is included in Attachment D <br /> Groundwater Analytical Results <br /> Groundwater samples were collected from GP-1 through GP-5 at approximately 14 feet bgs <br /> TPH-g and benzene were not reported in GP-1, GP-3, GP-4, and GP-5 TPH-g and benzene <br /> were reported in GP-2 at concentrations of 8,240 parts per billion (ppb) and 1,940 ppb, <br /> respectively MtBE was reported by EPA Method 8260 in all Geoprobe1' groundwater samples <br /> at concentrations ranging from 281 ppb in GP-5 to 47,000 ppb in GP-2 TAME was reported in <br /> GP-1 through GP-4 at concentrations of 18 4 ppb, 188 ppb, 268 ppb and 83 ppb, respectively <br /> TBA was reported in GP-2 through GP-4 at concentrations of 4,300 ppb, 7,030 ppb and <br /> 4,260 ppb, respectively ETBE was reported in GP-2 at 5 18 ppb Geoprobe groundwater <br /> analytical data is summarized in Table 2 and on Figure 7 Laboratory reports with COC <br /> documentation are included in Attachment D <br /> TPH-g was reported in MW-1 through MW-3 at concentrations of 25,700 ppb, 52 9 ppb and <br /> 5,900 ppb, respectively Benzene was reported in MW-1 and MW-3 at concentrations of <br /> S1,820 ppb and 41 3 ppb, respectively MtBE was reported in MW-1 through MW-3 at <br /> concentrations of 28,300 ppb, 5,830 ppb and 346 ppb, respectively TAME was reported in <br /> MW-1 through MW-3 at concentrations of 108 ppb, 45 ppb, and 2 08 ppb, respectively TBA <br /> was reported in MW-1 and MW-2 at concentrations of 3,710 ppb and 1,150 ppb, respectively <br /> Groundwater monitoring well analytical data is summarized in Table 4 and on Figure 7 <br /> Laboratory reports with COC documentation are included in Attachment D <br /> CONCLUSIONS <br /> With the exception of the area north and east of the product dispenser islands (near GP-1, GP-2, <br /> and MW-1)the lateral and vertical extent of soil impacted by TPH-g and BTEX has been <br /> generally defined by this investigation The lateral extent of petroleum hydrocarbons in the area <br /> of GP-1, GP-2, and MW-1 is still undefined above 25 feet bgs <br /> Groundwater samples collected during both phases of work indicate significant concentrations of <br /> petroleum hydrocarbons, including MTBE, in the groundwater The lateral extent of dissolved <br /> petroleum hydrocarbons has not been determined by this investigation The absence of water <br /> supply wells within 2000 feet of the subject site suggests that the groundwater impacts do not <br /> represent a threat to human health by groundwater ingestion and there is a low potential for <br /> SaCDP iLVICRFPIICOMMOMCw»islfujgUaeaShme"miecl,lmiscl88"40!A w dac IT CORPORA TION <br />