My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002927
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
ARCHIVED REPORTS_XR0002927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:33:20 AM
Creation date
1/31/2020 9:34:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002927
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IT Corporation <br /> A Member of The IT Group <br /> C� <br /> Ms Margaret Lagono Project 880-040 1A <br /> March 15, 2000 <br /> Page 3 <br /> collected from the bottom and sidewalls of the excavated areas under D-1 and D-8 Soil <br /> at the locations of D-3 and D-5 was excavated to approximately 4 5 and 5 feet bgs, <br /> respectively Soil sample locations, analytical results, and the extent of excavation for <br /> this event are shown on Figure 3 Analytical results are summarized on Tables 2 and 3 <br /> and CARS are presented in Appendix B <br /> STOCKPILED SOIL CHARACTERIZATION <br /> Four samples were collected from stockpiles generated during product line removal <br /> Clean excavated material was used as backfill Approximate locations of stockpiles <br /> from product line sampling are shown on Figure 4 Soil sample designations, collection <br /> dates, and the results of laboratory analyses performed on these samples are summarized <br /> in Table 1 Soils generated during the excavation activities were stockpiled on the <br /> adjacent parcel One four part composite sample was collected from ever-excavated soil <br /> piles for disposal characterization Over-excavation stockpile soil sample results are <br /> included in Table 2 <br /> SOIL DISPOSAL <br /> Wendt Construction transported a total of approximately 262 tons of petroleum <br /> hydrocarbon stockpiled soil offsite for disposal at the Forward Landfill in <br /> Manteca, California <br /> FINDINGS <br /> • Over-excavation activities removed approximately 262 tons of petroleum <br /> hydrocarbon impacted soil <br /> • Four piping samples contained TPBG at concentrations ranging from 4 19 (P-5) <br /> to 208 mg/kg (P-1) The area beneath P-1 was overexcavated during D-1 <br /> overexcavation activities <br /> • Benzene was detected in 3 piping soil samples at concentrations of 0 015a (P-5) <br /> and 0 0272 (P-6) mg/kg <br /> • MTBE was detected in 6 piping samples at concentrations ranging from <br /> 2 33 (P-3) to 49 4 (P-5)mg/kg <br /> IT CORPORATION <br /> SAC 111SACKFPIICOMMONVancfpI\Project$\Projccts1880\04018800401A as doc-98\TMM 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.