My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002943
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
ARCHIVED REPORTS_XR0002943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:18:53 AM
Creation date
1/31/2020 9:35:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002943
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms Vicki McCartney April 4, 2006 <br /> Page 2 <br />' Five Direct Push (DP) borings (GP-1 through GP-5) were made in August 2001 The borings were advanced <br /> to groundwater, and a discrete water sample was collected from each <br /> Three groundwater monitoring wells (MW-1 through MW-3) were installed in September 2000 (Figure 1) <br /> Quarterly groundwater monitoring and sampling was initiated in September 2000 <br /> In May 2002, one deep soil boring was made and two shallow sod borings were made and converted into <br />' monitoring wells MW-4 and MW-5 A dual-phase extraction (DPE) test was conducted from June 10 through <br /> 15, 2002 The DPE test was conducted by simultaneously extracting sod vapor and groundwater from well <br /> MW-1 <br /> rFour cone penetration tests (CPT) were conducted in September 2003 Discrete groundwater samples <br /> collected from HydroPuncho borings made adjacent to the CPT borings indicated the presence of methyl tert- <br /> butyl ether (MTBE) and benzene in groundwater northeast of the property beneath a city street <br /> In October 2004, Shaw submitted the Corrective Action Plan for Parkinson's Hammer 1-5 Arco(CAP) The <br />' CAP was tentatively approved, pending results from a deeper monitoring well located in the street east of the <br /> station and submission of contaminant mass calculations These activities are currently in progress <br />' Routine groundwater monitoring has been performed at the site since September 2000 There are five <br /> groundwater monitoring wells at the site, all with total depths of approximately 24 feet <br /> Groundwater Monitoring <br /> On January 16, 2006, groundwater samples and depth-to-water data were collected from monitoring wells <br /> MW-1 through MW-5 Groundwater samples were analyzed for total petroleum hydrocarbons as gasoline <br /> (TPHg), benzene, toluene, ethylbenzene, and xylenes (BTEX), 1,2-dibromoethane (EDB), 1,2-dichloroethane <br /> (1,2-DCA), and five gasoline oxygenates MTBE, di-isopropyl ether(DIPS), ethyl tert-butyl ether (ETRE), tert- <br /> amyl methyl ether(TAME), and tent-butyl alcohol (TBA) using U S Environmental Protection Agency(EPA) <br /> Methods 8015M/8021 B and 8260B Field and laboratory procedures are presented in Attachment 1 <br />' Certified analytical reports, chain-of-custody documentation, and field data sheets are presented in <br /> Attachment 2 <br /> Elevations and Gradient <br /> Groundwater elevations measured at the site were an average of 1 18 feet higher than measured in the <br /> previous sampling event of October 17, 2005 Groundwater flow was inferred to be to the northeast at an <br /> average gradient of 0 001, which was consistent with previous sampling events Groundwater elevation data <br /> are presented in Table 1 A groundwater elevation contour map based on the January 16, 2006, data is <br /> shown on Figure 1 <br /> 1 Final Concentrations <br /> TPHg-range hydrocarbons were reported in samples from wells MW-1 and MW-3 at concentrations of 710 <br /> micrograms per later (µg/L) and 64 pg/L, respectively Benzene was reported in the samples from wells MW-1 <br />' N57echPub166W4o1AArCOWD6Rplsl01}06Q1cbc Shaw Environmental,lilc <br />
The URL can be used to link to this page
Your browser does not support the video tag.