My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002948
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
ARCHIVED REPORTS_XR0002948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:43 AM
Creation date
1/31/2020 9:40:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002948
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms Vicki McCartney ProjectNo 880040 IA02010000 <br /> March 23, 2005 <br /> Page 2 <br /> Due to close proximity of groundwater, the maximum excavation depth was <br /> approximately 10 feet bgs <br /> In August 2000, five Geoprobe° borings (GP-1 through GP-5) were made by <br /> direct-push The borings were advanced to groundwater and a discrete water sample <br /> was collected Following groundwater sample collection, the borings were continued to a <br /> maximum depth of 30 feet bgs <br />' In September 2000, three groundwater monitoring wells (MW-1 through MW-3) were <br /> installed at locations selected based on the Geoprobe investigation results (Figure 1) <br /> tQuarterly groundwater monitoring and sampling was initiated via these wells in <br /> September 2000 <br /> In May 22 and 23, 2002, Shaw drilled one deep soil boring and installed monitoring <br /> wells (MW-4 and MW-5) in two other borings A dual phase extraction (DPE) test was <br /> conducted from June 10 through 15, 2002 The DPE test was conducted by <br /> simultaneously extracting soil vapor and groundwater from well MW-1 <br /> On September 2 and 3, 2003, Shaw observed the advancement of four cone penetration <br /> test (CPT) borings Discrete groundwater samples collected from HydroPuncho borings <br />' mad adjacent to the CPT borings indicated the presence of methyl tert-butyl ether <br /> (MTBE) in groundwater northeast of the site, and that the vertical extent of MTBE <br /> appeared to be limited to within approximately 30 feet of the ground surface <br />' GROUNDWATER MONITORING <br /> On January 17, 2005, groundwater samples and depth to water data were collected from <br /> monitoring wells MW-1 through MW-5 Groundwater samples were analyzed for the <br /> presence of total petroleum hydrocarbons as gasoline (TPHg), benzene, toluene, <br /> methylbenzene, xylenes (BTEX), 1,2-dibromoethane (EDB), 1,2-dichloroethane <br /> ' (1,2-DCA), and for five gasoline oxygenates, MTBE, di-isopropyl ether (DIPS), ethyl <br /> tert-butyl ether (ETBE), tert-amyl methyl ether (TAME), and tert-butyl alcohol (TBA) <br /> using U S Environmental Protection Agency (EPA) Methods 8015GRO/8021B <br /> SHAW ENVIRONMENTAL, INC <br /> N 1sacDP120051Pp188018800401A Saa doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.