My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:11:07 PM
Creation date
1/31/2020 11:05:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the adjacent Taco Bell facility to the southeast(SB-6): <br /> tr1 ' ! 1 <br /> 6�t The SJCEHD provided a technical response to the Workplan in+correspondence dated June 5, 2009, <br /> outlining the following comments. Included below is ATC's proposed action to address each,point: <br /> Proposed Action 1 I I 4 <br /> SJCEHD: The site map illustrating the proposed location for SB-4 does not include the <br /> approximate location where soil sample.QS-2 was collected. Based on information on file at <br /> the SJCEHD, the proposed location for SB-4 is not where soil sample QS-2 was collected,' ) <br /> therefore,you must provide technical justification for the proposed sampling point for SB-4, I <br /> collection of a grab groundwater sample at approximately fifteen feet bgs, and collection of a <br /> Gsoil sample at the capillary fringe. <br /> I ' I <br /> ATC: Based on 'the September 1990 ExcelTech Site Plan obtained from SJCEHD <br /> (attached),ATC will re-locate proposed boring SB-4 to an area that approximates where QS-2 l <br /> was collected. i 1 <br /> Proposed Action 2 <br /> SJCEHD: ATC proposes to advance the boring (SB-5) to approximately forty feet bgs and <br /> collect a grabgroundwatersample. instead of the proposed boring, the SJCEHD believes a <br /> monitoring well should be installed adjacent to soil boring ATC-5, and screened between <br /> approximately twenty and twenty-five feet bgs. Noting that MTBE was detected at 2,900 pg/L <br /> in a grab groundwater sample,collected at twenty feet bgs from AC-5, the EHD believes a } <br /> monitoring well will betteraddress the possible plume migration down gradient of the source <br /> area. <br /> ATC: ATC will complete a groundwater monitoring well within proposed soil boring SB-5 <br /> r� (proposed well MW-11). Additional discussion regarding methodology for installation, <br /> development, and sampling of the proposed groundwater monitoring well is outlined"below. <br /> Proposed Action 3 3 <br /> SJCEHD: The EHD approves the advancement of S6-6 as described. <br /> i <br /> r ATC Boring SB-6 will be completed as originally proposed. <br /> Monitorina'Well Installation, Development,and Sampling <br /> CATC will utilize hand-auger techniques to clear the proposed monitoring well location to approximately 5 <br /> feet bgs. All drilling and sampling activities will be performed consistent with ATC's standard operating. <br /> A soil boring will be drilled using a Combination Drill Rig which is equipped with 8-inch outer diameter(OD) , <br /> 1• hollow stem augers and direct push technology. Drilling will be conducted by a California C57-licensed <br /> drilling company. An ATC field. scientist, under the responsible charge of a California registered <br /> n professional engineer or geologist; Will log the boring and collect soil samples. <br /> LIt <br /> During drilling, an approximately 1.5-inch diameter borehole will be advanced and logged where <br /> applicable, to an approximate depth of 20 to 25 feet bgs. Soil samples will be collected just above the <br /> C . water table (i.e., at approximately 10 feet bgs)or where elevated PID readings indicate the presence of <br /> V- �i Additional Lrvestigation Workplan Addendum <br /> Quit Stap No 132,Stdcktoir,GA <br /> AWC <br /> J*28,2W9 <br /> :i <br />
The URL can be used to link to this page
Your browser does not support the video tag.