Laserfiche WebLink
the adjacent Taco Bell facility to the southeast(SB-6). <br /> The SJCEHD provided a technical response to the Workplan in correspondence dated June 5, 2009, <br /> outlining the following comments. Included below is ATC's proposed action to address each point: <br /> Proposed Action 1 <br /> SJCEHD: The site map illustrating the proposed.location for SB-4 does not include the <br /> approximate location where soil sample QS-2 was collected. Based on information on file at <br /> the SJCEHD, the proposed location for SB-4 is not where soil sample QS-2 was collected; <br /> therefore, you must provide technical justification for the proposed sampling point for SB-4, <br /> collection of a grab groundwater sample at approximately fifteen feet bgs, and collection of a <br /> soil sample at the capillary fringe. <br /> K?,) ,1 <br /> ATC: Based on the September 1990 ExcelTech Site Plan obtained from SJCEHD <br /> (attached),ATC will re-locate proposed bp ring SB-4 to an area that approximates where QS-2 h � <br /> was collected. y!i <br /> Proposed Action 2 <br /> SJCEHD: ATC proposes to advance the boring (SB-5) to approximately forty feet bgs and <br /> collect a grab groundwater sample. Instead of the proposed boring, the SJCEHD believes a <br /> monitoring well should be installed adjacent to soil boring ATC-5, and screened between <br /> approximately twenty and twenty-five feet bgs. Noting that MTBE was detected at 2,900 pg/L <br /> in a grab groundwater sample collected at twenty feet bgs from ATC-5, the EHD believes a <br /> monitoring well will better address the possible plume migration down gradient of the source <br /> area. <br /> { <br /> ATC: ATC will complete a groundwater monitoring well within proposed soil boring SB-5 <br /> (proposed well MW-11). Additional discussion regarding methodology for installation, <br /> development, and sampling of the proposed groundwater monitoring well is outlined below. <br /> Proposed Action 3 <br /> s <br /> SJCEHD: The EHD approves the advancement of SB-6 as described. <br /> iy <br /> ATC: Boring SB-6 will be completed as originally proposed. <br /> Monitoring Well Installation. Development, and Sampling <br /> ATC will utilize hand-auger techniques to clear the proposed monitoring well location to approximately 5 <br /> feet bgs. All drilling and sampling activities will be performed consistent with ATC's standard operating. <br /> A soil boring will be drilled using a Combination Drill Rig which is equipped with 8-inch outer diameter(OD) <br /> hollow stem augers and direct push technology. Drilling will be conducted by a California C57-licensed <br /> drilling company. An ATC field. scientist, under the responsible charge of a California registered <br /> professional engineer or geologist, will log the boring and collect soil samples. <br /> During drilling, an approximately�1.5-inchh diameterborehole';will be advanced and logged, where <br /> applicable, to an approximate depth of 20 to 2.5 feet bgs. Soil samples will be collected just above the <br /> water table (i.e., at approximately 10 feet bgs)or where elevated PID readings indicate the presence of <br /> Additional Investigation Workplan Addendum <br /> Quik Slop No. 132,Stockton,CA <br /> . ., July 28,2009 <br />