Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name: dutfof VIM Project Number. '75 loZSa3.3243 <br /> Address: Date:Well Lock Number. <br /> Wel! NumberMI- Well Integrity: <br /> Development(PurgetSarnpl s): Ambient Conditions: <br /> Pre-Purge DO (rng[L) <br /> Screened at WELL VOLUME CALCULATION <br /> Weil Casing Total Well Depth to Linear Feet Gallons Per <br /> diameterin. Gou r of GVIf C Wiser Foot Wei!Volume <br /> 0.38 <br /> 4 D�� - %. SS f��J x 0.66 a . 1 � <br /> 4.5 - x 0.83 = <br /> 6 = x 1.5 <br /> GROUNDWATER SURFACE INSPECTION ILER CHECK) <br /> Floating Product(R}(in.): SheeiVindescence: Cdor S A <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer❑Submersible Pump;RAir Diaphragm Pump;O Honda Pump;[]Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Tamp. Colorrrurbidity <br /> Purged (gal.) Time pH (Pwumhos) (*C) (other) <br /> 1 3 � �-.5. �— Recovery <br /> 2 7� Rate: <br /> 3 1Y S Fast <br /> 4 Medium <br /> 5 Slow <br /> 7 <br /> 8 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: 1,'5h -&J:L <br /> Water Leve! Recovery Sample Containers <br /> Depth to GW(fL) No. Preservation Method/pH <br /> (1) Initially 1 liter(L), amber glass <br /> (P) After Purging 40 ml VOA 6' _ZE,77aZ <br /> P-0.8(P-!)= 80%Recovery 500 m! polypropylene ' <br /> (S) Before Sampling Trip Stank <br /> (P-S)/(P-1)X 100 =' �/_0Z/ <br /> %Total Recovery Sample Date/Time. - _0 12-00 Turbidity (NTU): 2(a <br /> � <br /> Calibrate Date/Time:: 5` �t� � _ EH (MEV): <br /> {' PURGED WATER CONTAINMENT <br /> Total drums at site: Water )Soil Water pump through treatment system J05.2 <br /> Remarks: P_ �T J `iPy C.f r' 7� _ I�%� ��5 <br /> lvlm.,enudmm+suasunrnce aAouPtcw s.Kro��rr„R�z y, <br /> 1 <br />