Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name: aul oQ i32 Project Number. 75 6,7,T63.37.63 <br /> Address: Date: <br /> Z <br /> Well Lode Number. <br /> Well Numberw Well Integrity: <br /> Development/Purge/Sampl s): Ambient Conditions: <br /> Pre-Purge DO(mg/L) <br /> Screened at WELL VOLUME CALCULATION <br /> Welt ming Total Well Depth to Linear Feet Gallons Per <br /> in Goundwatar of GW Ungar Foot 1 Well Volume 1. <br /> ZX 0.17 = <br /> 4 C?, <br /> Sz = s x 0.36 <br /> 4.5 _ a � X 066 <br /> X 0.83 <br /> 6 = X 1.5 - <br /> GROUNDWATER SURFACE INSPECTION(BAILER CHECK) <br /> FloaEing Product(R)(in.): Sheen/iridescence: Odor <br /> GROUNDWATER PURGING PURGE METHOD <br /> Stainless Steel Bailer;OSubmersible Pump;JRAir Diaphragm Pump;❑Honda Pump;Q Other <br /> ' Stagnant Volume <br /> Volumes Purged Conductivity Temp. Colorfrurbidity <br /> Purged (gal.) Time pH (pslumhos) (°C) (other) <br /> 0 0 Z34S c'6 �Z5�~ C1��� <br /> 1 :i. r -j-' 7`,56� ' Z:,", o Recovery <br /> 2 Z 3TC Rate. <br /> 4 21um <br /> 5 Slow <br /> 6 <br /> 8 <br /> ' 9 <br /> 10 <br /> GROUNDWATER SAMPLINGSampling Equipment: ,5 . <br /> Water Level Recovery Sample Containers <br /> Depth to GW(ft) No. Preservation Method/pH <br /> (I) Initially g 1 liter(L), amber glass <br /> ' (P) After Purging 40 mi VOA 6 <br /> P-0.8(P-1)= 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling Trip Blank <br /> (P-S)/(P-1)X 100 = % Total Recovery <br /> Sample DateTme: / / 1 Turbidity (NTU): Li- <br /> Calibrate DateTme: EH (MEV): <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Soil Water pump through treatment system <br /> Remarks: <br /> SYlaartlan�n�l5i'BSURfAC"E GiUIlRGW.S.mpkias-PuRQ 4oe <br /> I <br />