Laserfiche WebLink
i f- <br /> F <br /> Project Name: -4132- Project Number. 6,2SdZ 51 , <br /> Address: 355 Date: <br /> a Well Lock Number. <br /> Well Number. - S Well Integrity: <br /> Development/Purge/Sampler(s): Ambient Conditions: is <br /> Pre-Purge DO (mg&) <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Wen Dem to Linear Fest Gallons Per <br /> 1an+e ct(In.) Depth(ff- - _-Goundwattw G1YL of GW Llne r Fact 1 Wen Volume(aaU <br /> 0. <br /> Z • !a �.��j s x 8 <br /> r <br /> Z0-R7 x o.aa <br /> X 0.66 <br /> 4.8 - x 0.83 <br /> L 6 X 1.5 <br /> GROU DWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft.) ¢n.): Sheen/Iridescence: `l y) Odor. T� <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑Stainless Steel Bailer, Submersible Pump;xAir Diaphragm Pump; ❑ Honda Pump;❑.Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. ColorlTurbidity <br /> Purged (gal.) Time PH (pslumhos) (SC) (other) <br /> FMedlum <br /> covery <br /> 2 �— '1.io5 ? Rate: N . <br /> 3 10.5 2 , : 010 S C <br /> r 4 ts- <br /> 7 . <br /> 8 <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> _Water Level Recovery Sample Containers - <br /> Depth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially 1 liter(L);'amber glass <br /> (P) After Purging 6 40 ml VOA <br /> P - 0.8 (P-1) = 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling .o7 Trip Blank <br /> (P-S)/ (P-1) x 100 I60 _% T tai/lRecovery <br /> Sample DatelTme: L- -0) �7 5 Turbidity (NTU). b•3 <br /> Calibrate DatelTime: 5,403--01& ?d EH (n,tEv): - 37 <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Soil Water pump through treatment system <br /> r <br /> Remarks: <br />