Laserfiche WebLink
Project Name: Project Number. S. 62d 5tQ <br /> Address: 5 Date: -2 <br /> G Q4 Well Lock Number. <br /> Well Number - well Integrity: <br /> Development/Purge/Sampler(s): Ambient Conditions: <br /> Pre-Purge DO (mg/L) <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing Total well Depth to L near Fee! Gallons Per <br /> _LaaMster_an.) Death(ft.) Goundwater!GW) of GN Linear Foot 1 Wel!Volume(aal.l <br /> �. L t• � _ ■ X 0.38 <br /> 3 <br /> = Z t1- l3 X 0.38 <br /> 4 - X 0.66 a <br /> 4.5 - X 0.83 <br /> 8 - ■ X 3.5 a <br /> GROUNDWATER SURFACE INSPECTION BAILER CHECK) <br /> Floating Product (ft.) (1n.): Ar SheenAddescence: Odor: u� <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑Stainless Steel Bailer, ❑Submersible Pump; 1"Air Diaphragm Pump; C1 Honda Pump;❑Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> Purged (gal.) Time pH (Ns/umbos) C) - (other) <br /> 1 �•5 S�iE .t 03 �Z'�.a Lassit <br /> ecovery <br /> ,'�yz �,3�? 71,- -a Le <br /> Rate: <br /> 2 -7 <br /> 3 10-5 �� IS d Z� a 4 1�Y9 x_19 LO-5121.f? m <br /> 5 Slow <br /> 8 <br /> ,i 7 <br /> ■ 8 <br /> 90 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> Water Level Recovery Samole Containers <br /> De th to GW(ft.) No. Preservation Method/pH <br /> (1) Initially '' 4— 1 liter(z),-amber glass <br /> ' (P) After Purging 40 ml VOA .- <br /> P - 0.8 (P-1) = 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling �� Trip Blank <br /> (P-S)/ (P-1) X 100 = r"c*, % Total Recovery <br /> S, 1 <br /> � f Sample Date/Time: 0-Z3-��,/god Turbidity (NTU): <br /> Calibrate Date/Time: i b-so EH (MEV):^ /D <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Soil Wafer pump through treatment system <br /> Remarks: <br /> E'.5E\1h'EV�'�C`•ux")unplvg?•�ry_.1o: <br />