Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name: Q1_,_A1 13 Project I`lumber: _75.. �c 3. 3.;2 <br /> • Address: s-ss� Date: <br /> Well Lock Nunibe . <br /> Well Number: Well Integrity: <br /> Development/Purge/Sampler(s): JI Ve Ambient Conditions: . <br /> Pre-Purge DO (mg1L) <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Feet Gallons Per <br /> diameter in.) Depth ft Goundwater(GM of GW Linear Foot 1 Well Volume al: <br /> /9'. 's O �/7 g,q� x 0.17 <br /> 3 - = x 0.3a - <br /> 4 - - X 0.68 <br /> 4.5 - — x 0.83 — <br /> 6 = x 1.5 _ <br /> GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft.) (in.): 12o Sheenllridescence: ho Odor. ho <br /> GROUNDWATER PURGING PURGE METHOD <br /> Stainless Steel Bailer, Submersible Pump; Air Diaphragm Pump; Honda Pump; th y:/I...� <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> Purged (gal.) Time pH (pslumhos) (°C) (other) <br /> . 1 1C_ Recovery <br /> 2 3;o .1 'l_o 4ys__ c9•//3 _ _ /Y, 7 Rate: <br /> 3 s3 - g <br /> 4 6 r Z D-,�/ /it Medium <br /> 5 Slow <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING Sarnpling Equipment: <br /> Water Level Recove Sample Containers <br /> Depth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially 9-17_ 1 liter(L), amber glass <br /> (P) Aver Purging y'/9 40 ml VOA <br /> P- 0.8 (P-1) = 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling Trip Blank <br /> (P-S)I(P-1) X 100 = /ck:;, % Total Recovery <br /> Sample Date/Time: 3 f 6C-a o Turbidity (NTU): <br /> Calibrate Detc-Mme: EH (MEV): L44- <br /> PURGED WATER CONTAINMENT <br /> *Total drums at site: Water Soil Water pump through treatment system <br /> Remarks: a s <br />