Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> 1 Project Name: * I U Project Num er: <br /> Address: �35xT!i VIA'Ov"ce jAng. Date: 12-/,j41 A94 <br /> S-ro k ton f Well Lack !`tem er: <br /> ' V1e11 Number; ,-w Well Integrity: _ ooA <br /> Development/Purge/Sampler(s): -f T Ambient Conditions: ✓ rcd <br /> ' Pre-Purge DO (mg1L) N IA <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Feet Gallons Per <br /> —Diameter in.! De thft. - Goundwater G _ of GW Linear Foot – 1 Well Volume al: <br /> 2 Z6-75, !�/`li`f IS.$S X 0.17 <br /> 3 - = k 0.38 — <br /> 4 - = X 0.85 — <br /> 4.5 = _ X 0.83 <br /> 6 X 1.5 <br /> GROUNDWATER SURFACE INSPECTION (BA ER CHECK) <br /> Floating Product(ft.) (in.): 1IW6 Sheenliddescence: Odar. r1')4,1- <br /> GROUNDWATER PURGING PURGE METHOD <br /> ' Stainless Steel Bailer, - Submersible Pump; Air Diaphragm Pump; Honda Purnp; Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> Purged (gal.) Time pH Gwjw"04 (°C) (other) <br /> S1� . <br /> 1 1 . r r r t�d •Z� C�. 11 G 'z-1-3 oe a Recovery <br /> 2 2 .2z 1117 -mss a lt. S z- 1 •yRate: <br /> � <br /> 3 3 --_ till zro,44 <br /> ' 4 Medium <br /> 5 Slow <br /> 1 7 <br /> 8 <br /> 1 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: Thi syd5 Ab 16 _SiAl IE R <br /> 1 Water Level Recovery Sample Containers I <br /> Depth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially _ILS1 liter(T:,), amber glass <br /> (P) After Purging _ if _ 40 ml VOA _(",(_,_ <br /> P- 0.8 (P-1) = i :5 .80% Recovery 500 mi polypropylene <br /> (S) Before Sampling 1 0 Trip Blank <br /> ' (P-S)1(P-1) X 100 = V,D %Total Recovery <br /> Sample Datemme: ��+i�a �` _ Turbidity (NTU): PJ A <br /> 1 Calibrate Dateffime: ,L a EH (MEV): tjA <br /> PURGED WATER CONTAINMENT <br /> ' Dotal drums at site: Water Sail _ Water pump through treatment system f' <br /> Remarks: <br /> 1 <br />