Laserfiche WebLink
3 <br /> . i <br /> ' 2. GROUNDWATER SAMPLING <br /> On March 27, 2000, in accordance with ATC Associates' Field Protocol (Appendix A), groundwater <br /> ' samples were collected from on-site groundwater monitoring wells MW-1R, MW-2, MW-3, MW-4, MW- <br /> 5, and off-site groundwater monitoring wells MW-b, MW-7, and MW-8. Groundwater purged from the <br /> ' wells, and equipment decontamination water was placed in Department of Transportation (DOT) <br /> approved 17H drums. The contents of the drums were transported by Integrated Wastestream <br /> Management, a licensed hauler from Milpitas, California, for disposal at the McKittrick Waste Treatment <br /> Site (WTS), a licensed waste treatment site located in McKittrick, California. The volume of groundwater <br /> removed from the wells and other measured sampling parameters are noted on the water sampling log <br /> ' included in Appendix B. <br /> r <br /> 1 <br /> 1 <br /> E� <br /> 2000 First Quarter Groundwater Monitoring Report <br /> ]:Un ProgressMIK5TOMS 132(0003)IREPORT5520001ts1Qtr2OOOrptdoc(May 23.2000] <br /> i <br />