Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGE/SAMPLING WORK SHEET <br /> Project Name: Project Number,iS 2 5 Zb <br /> Address: - 30Date: 7- - f _ <br /> .Well Lock Number. <br /> R Well Number. - '� Well Integrity: <br /> Development/Purge/Sampler(s): _ Ambient Conditions: 947777 <br /> IP <br /> re-Purge DO (mglL) <br /> reened at_ _ WELL VOLUME CALCULATION <br /> ' Well Casing Total Well Depth to Linear Feet Gallons Per <br /> lameter In. �72 <br /> 4e Ih (R`. Goundwater G f GW 1 Linear Foot 1 Well Volume ai. <br /> 3 L�'�` X 0.38 = • � <br /> z, <br /> 4 - X 0.66 <br /> 4.5 - - X 0.83 = <br /> $ - = X 1.5 <br /> GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft.) (in.): t,9- Sheen/Iridescence: _ b6 Odor: do <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, ❑ Submersible Pump-,,?"Air Diaphragm Pump; ❑Honda Pump; ❑ Other <br /> I <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> Purged (gal.) Time PH (pslumhos) C) (other) <br /> 0 0 /S� ?• ZS j�,i Gid <br /> 7 2. f451 7, Recovery <br /> 2 S 115 z �O Rate: <br /> 3 "2s 3 (Q Est <br /> 4 !� 1IS �� (a�} iD ^ Medium <br /> 5 Slow <br /> 6 <br /> 7 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> Water Level Recon Sample Containers <br /> Deqth�to� GW(ft.) No. -Preservation Method/pH <br /> (1) Initially --� �•3! 1 liter(L), amber glass <br /> (P) After Purging 7.05_ 40 ml VOA r_; F <br /> P - 0.8 (P-1) = !.Z! 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling V, 7S1' Trip Blank <br /> (P-S) /(P-1) X 100 = AI-6 % Total Recovery <br /> Sample DateiTime: _4� S-���1 f Z-el'-5 Turbidity (NTU): <br /> Calibrate Datei7ime: u ;o EH (MEV): <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Soil Water pump through treatment system <br /> Remarks: u" <br /> ' E.UOMFkAENVIROA'GW Su pim -Purj:_.do <br />