Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name: U iL 5TH Z Project Number 7S• <br /> Address: Date: <br /> .Well Lock Number. <br /> Well Number _ - 5 Well Integrity: <br /> Development/Purge/Sampler(s): -_ Ambient Conditions <br /> Pre-Purge <br /> screened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Feet Gallons Per <br /> Diameter in. De Ihr(ft. Goundwater G ofpGW�1 Linear Foot i W ii volume at. <br /> ZX 0.17 <br /> �8' 1� �•� = C- I X 4.38 = 3 <br /> - - - <br /> 4 = X 0.66 <br /> —5 = <br /> 4- X 0.83 <br /> 6 = X 1.5 - <br /> GRO NDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft.) (in.): Sheen/Iridescence: �ic: Odor: <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, ❑ Submersible Pump; Air Diaphragm Pump; ❑ Honda Pump; ❑ Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> Purged (gal.) Time pH (pslumhos) (°C) (other) <br /> L0 0 13ZG?- GI-EASZ. Recovery <br /> 1 � t. 133� �� f Z�'2- - <br /> 2 Z A 1,501 <br /> 3 - X 333 V3 to <br /> 2F. Rate: <br /> 4 �� 13� ,�� ��-A_5_ Medium <br /> 5 Slow <br /> 6 <br /> 7 <br /> g <br /> 10 <br /> ,'• GROUNDWATER SAMPLING Sampling Equipment: <br /> Water Level Rec_over7t Sample Containers <br /> De th to GW(ft.) No. Preservation Method/pH <br /> (1) Initially , 1 liter (L), amber glass <br /> (P) After Purgingx.40 40 ml VOA H,' fi L 2- _ <br /> P -0.8 (P-i) _ 11.0o 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling 4,Z> Trip Blank <br /> (P-S) /(P-1)X 100 = ICO % Total Recovery <br /> Sample Date/Time: - �Z -2.�-a l j 5S5 Turbidity (NTU): <br /> Calibrate DatelTime: - ., i O03e- EH (MEV):� I <br /> PURGED WATER CONTAINMENT <br /> Total drams at site: Water Soil Water pump through treatment system _ <br /> Remarks: <br /> E.\ADIlNzNviRO 'GWS npZing—"-2da <br />