Laserfiche WebLink
3 <br /> 2.0 QUARTERLY WELL PUMPING <br /> on <br /> Asa reed u with the San Joaquin Count Public Health Services (SJCPHS), <br /> 9 P q Y <br />' groundwater is pumped out of Monitoring Well MW-5 for approximately 3 hours on <br /> a quarterly basis as an interim remedial measure (RESNA, November 1991 ) For this <br /> quarter, Monitoring Well MW-5 was pumped out on February 22, 1995 As agreed, <br /> prior to pumping, a groundwater sample designated as MW-5 was collected After <br /> pumping Monitoring Well MW-5 for about three hours and extracting approximately <br /> 500 gallons of water, another groundwater sample designated as MW-5A was <br /> collected <br /> The groundwater extracted from Monitoring Well MW-5 was transported b Erickson <br /> 9 g P Y <br /> 1 Inc , a licensed trucking company from Richmond, California,to Gibson Environmental, <br /> a licensed recycling facility located in Redwood City, California A copy of the <br /> nonhazardous waste manifest and Erikson Inc Customer Service Order is included in <br /> Appendix A A copy of the Water Sampling Logs are included in Appendix B <br /> PL%W 194 2735REPORT511 STQTR 608 IJun 7 19951 tt®ttteEnvlronmental <br />