My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002897
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0002897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 3:20:58 PM
Creation date
1/31/2020 1:54:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002897
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Working to Restore Nature <br /> September 1993 Quarterly Groundwater Sampling & Analysis December 1, 1993 <br />' Quik Stop Market No 132, Stockton, California F7132 93 <br />' laboratory analytical results of the soil and groundwater samples collected from MW-6 and <br /> MW-7 found that TPHg, BTEX, and fecal coliform were not detected in either well <br /> (RESNA, January 1993) On the basis of data gathered from the installation of these two <br /> wells and the results of our December 1992 quarterly groundwater sampling and analysis, <br /> RESNA made the following recommendations <br /> • Sampling and analysts of monitoring wells MW-3 and MW-4 be discontinued <br /> Quarterly measurement of groundwater elevations will continue <br />' • Analysis of groundwater samples for fecal coliform be discontinued <br /> • Add monitoring wells MW-6 and MW-7 to the array of wells monitored <br />' quarterly <br /> On Tuesday, February 2, 1993, the SJCPHS approved these changes and requested that <br /> RESNA continue the quarterly pumping of well MW-5 (Personal communication, February <br /> 2, 1993) <br /> 1 <br />' A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.