Laserfiche WebLink
FROM 1997.x" ;14 17:50 #888 P.17/24 <br /> F.ebruary 14, 1997 } <br /> Pace )Ci <br /> Figure'6 - Site Map Atter SVE System Operation (November 1990 - <br /> November 1997) <br /> Figure 7 - Geologic Cross-Section A-A'- Atter SVE System <br /> Operation (November 1990- November 1992) <br /> Figure S - Geolo6ic Cross-Section C-C'- After SVE System <br /> Operation (November 1990- November 1992) <br /> Attachment A - SVE Operational Data and Mass Calculations of <br /> Hydrocarbons in Solt <br /> Attachment B - Fate and Transport Model <br /> Attachment C - Groundwater Monitoring and SVE Well Logs <br /> Attachment D - Groundwater Analytical Data <br /> Attachment E - Case Closure Checklist <br /> cc: Mr. Jeff Moore. Greenwood & Moore. Inc. <br /> Mr, Steve Puleheon, Taco Bell Corporation <br /> Ms. Elizabeth Thayer,Regional Water Quality Control Board - Central Valley <br /> Mr. Brett Hunter, Chevron Products Company <br /> f <br /> I <br /> { <br /> 3201337BCLOSURF3 f <br /> I <br /> i <br /> t <br /> i <br /> 1 <br />