Laserfiche WebLink
i <br /> 45 East Harding Chronology 1J PA <br /> Page 6 <br /> 1994 <br /> 1/4/94 Monitoring well, MW14 was installed. <br /> One 1,000 gallon underground storage tank was removed and a soil sample <br /> collected at 8.5 feet bgs. <br /> Six soil borings, S134 - S139, were drilled and sampled to determine the extent of soil <br /> contamination and to investigate suspect area of former underground tank <br /> structures. <br /> 1995 <br /> Four soil borings, SB 10 - SB 13, were drilled and sampled to determine <br /> concentrations of petroleum hydrocarbons remaining in the soil. <br /> i <br /> 1996 <br /> Groundwater samples were collected from all monitoring wells, since groundwater levels had risen <br /> above the screened intervals of the formerly dry monitoring wells. <br />