My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 6:04:48 PM
Creation date
1/31/2020 2:30:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Greenwo dc� oore, Inc. <br /> Civil Engineers • Land Surveyors • Designers • Planners <br /> November 5, 1996 <br /> Mr. Steve Pulcheon, Construction Manager <br /> Taco Bell Corporation <br /> 17901 Von Karman, Mail Drop 715 <br /> Irvine, CA 92614-6212 <br /> Re: Pre-Construction Meeting Notes <br /> Taco Bell/Stockton <br /> Site No. 06-1146 <br /> G&M Job No. 96009 <br /> Dear Steve, <br /> Please find the following summary of issues discussed during the above referenced pre- <br /> construction meeting. <br /> The following persons were in attendance: <br /> Jeff Moore, Greenwood & Moore, Inc. <br /> Steve Pulcheon, Taco Bell <br /> Jim McClain, Cal Select Builders <br /> Jim Engel, Cal Select Builders <br /> Brett Hunter, Chevron <br /> Mary Meays, Health Department <br /> 1. Brett Hunter shall have the soil contamination mitigation report to Mary Meays by <br /> November 13, 1996. <br /> 2. Mary has committed to review Chevron's report and have a preliminary assessment to <br /> Taco Bell by November 19, 1996. This preliminary assessment would state whether or <br /> not she felt that active or passive soil remediation was required. <br /> 3. Greenwood & Moore to provide Mary with a copy of the most recent site plan. <br /> 4. Brett shall review with his superiors at Chevron the possibility of obtaining approval for <br /> the installation of a pre-piping for a vapor extraction system that may be required by <br /> Mary. Taco Bell was very insistent that Chevron be prepared to make this concession in <br /> the event that Mary determines that active remediation was required. Taco Bell will not <br /> accept any solution proposed by Chevron that would necessitate the removal of newly <br /> ENGINEERING TOWARDS THE FUTURE <br /> 19131 Redwood Road,Castro Valley,CA 94546 • • Office:(510) 581-2772 • Fax:(510) 581-6913 <br />
The URL can be used to link to this page
Your browser does not support the video tag.