My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 6:04:48 PM
Creation date
1/31/2020 2:30:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nrevmn <br /> �r <br /> r� /al. j�E <br /> �-Tf� <br /> ' Chevron i <br /> ryFF.. fj yl <br /> .. , . t;U4 C) ' 1. 13 <br /> Chevron USA.Product Zompany <br /> - 2410 Camino Ramon <br /> August 8, 1994 - San Ramon,CA 94583 - 11 <br /> P.O.Box 5004 { <br /> San Ramon,CA 94583-0804 <br /> Marketing Department - <br /> ' MS. Mary Ways Phone 510 842 9500 <br /> San Joaquin County Environmental Health <br /> P.O. Box 2009 <br /> Stockton, CA .95201 ' <br /> Re: Former Chevron Station#9-1918. 45 East Harding Way Stockton CA <br /> Attached groundwater monitoring report(GTI,5/20/94) <br /> Dear Ms. Meays: <br /> Attached is a report dated May 20, 1994, which was prepared by Chevron's: consultant, <br /> Groundwater Technology Inc. (GTI), to describe the results of groundwater monitoring which was <br /> performed at the subject site on April 6, 1994. Seven of the fourteen site-related wells were gauged A <br /> and sampled. The remaining seven wells were dry. <br /> _ 11 <br /> The measured direction of groundwater flow.beneath the site was generally toward the east. This <br /> was consistent with previous gradient measurements. Groundwater samples were analyzed forthe <br /> presence of TPHGas and BTEX constituents. Detectable concentrations of TPHG were measured <br /> at wells MW-11, MW-13,and MW-14. Non-detect results were measured at wells MW-2R, MW- <br /> 9, MW-10, and MW 12. <br /> r, <br /> Chevron is preparing a Corrective Action Plan to propose final corrective actions to be taken afithe <br /> subject site. <br /> If you have any questions or comments, I can be reached at(510) 842-8695. <br /> ±I <br /> is <br /> Sincerely; <br /> l�. <br /> Brett L. Hunter I <br />" Environmental Engineer <br /> Site Assessment and Remediation <br /> Attachment <br /> } <br /> i <br /> rr}�Recycled <br />
The URL can be used to link to this page
Your browser does not support the video tag.