My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 6:04:48 PM
Creation date
1/31/2020 2:30:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron . <br /> [hevion <br /> A i1� I Y .J t..tS <br /> 94 APR 22 PN 2: 00 <br /> _ Chevron U.S.A.Products Company <br /> 2410 Camino Ramon <br /> r Apn1.20, 1994 San Ramon,CA 94583 .PO.Box 5004 <br /> San Ramon,CA 94583-0804 <br /> Marketing Department <br /> Ms. Mary Ways Phone 510 842 9500 <br /> San Joaquin County Environmental Health <br /> P.O. Box 2009 <br /> Stockton,CA 95201 <br /> Re: Former Chevron Station#9-1918. 45 East Harding Way, Stockton, CA <br /> Attached work plan for additional environmental investigation (GTI,4/12/94) <br /> Dear Ms. Meays: <br /> Attached is a work plan dated April 12, 1994, which was prepared by Chevron's consultant, <br /> Groundwater Technology Inc. (GTI), to describe the drilling and sampling of six soil borings. The <br /> proposed boring located at the southeast portion of the property will investigate soil beneath the <br /> recently removed UST (#1) and as such, will be drilled closer to the former tank location. This is <br /> slightly different from the proposed location depicted in GTI's work plan:- <br /> Chevron is prepared to begin this work once permits and approval have been obtained from your <br /> agency. If you have any questions or comments, I can be reached at(510) 842-8695. <br /> Sincerely, <br /> Brett L. Hunter <br /> Environmental Engineer <br /> Site Assessment and Remediation <br /> Attachment <br /> cc: Elizabeth Thayer,Central Valley,RWQCB, Sacramento, CA j <br /> Carolyn Lawrence, 6318 Chesapeake Circle,Stockton, CA95219 <br /> Michael E Babitzke, 6 South El'Dorado, Suite 305, Stockton, CA 95202 <br /> Bette Owen, Chevron USA, Products Company, San Ramon, CA (w/o attachment) <br /> . Recic;e;cf <br />
The URL can be used to link to this page
Your browser does not support the video tag.